9706/23/M/J/24 question 4: worked solution (May/June 2024, paper 23)
Show as plain textHide plain text
Cambridge AS Level Accounting 9706 · 2.2 Traditional costing methods Worked solution from the Cost and management accounting (AS Level) Theory (Paper 2) booklet, Part 2 of 2. Q38 9706/23/M/J/24 original Q4 Structured · 30 marks Worked solution (a) (i) Allocation : overhead expenses that are directly attributed [1] to a specific cost centre . [1] (ii) Apportionment : overhead expenses are shared between different departments [1] using a suitable basis . [1] (b) Bases: electricity by power (kilowatt hours, 42 000 in total); rent by floor area (4 400 square metres in total); canteen by number of employees; stores by issues from stores. Details Total $ Preparation $ Finishing $ Stores $ Canteen $ Overheads allocated 272 120 184 100 60 800 10 960 16 260 Electricity 63 000 48 000 12 000 600 2 400 [1] Rent 44 000 24 000 18 000 500 1 500 [1] Total overheads 379 120 256 100 90 800 12 060 20 160 Apportion canteen – 11 520 7 200 1 440 (20 160) [1] Subtotal 379 120 267 620 98 000 13 500 – Apportion stores – 9 529 3 971 (13 500) – [1] Subtotal 379 120 277 149 101 971 – – [2] (c) Overhead absorption rate = overheads ÷ hours. Preparation uses machine hours ; Finishing uses labour hours . Preparation = $277 149 ÷ 17 500 = $15.837, so $15.84 [1] per machine hour [1] Finishing = $101 971 ÷ 20 300 = $5.023, so $5.02 [1] per labour hour [1] (d) Overhead absorbed = actual hours × rate. The budgeted hours were 17 500 and the actual hours were 16 920, so the difference is 17 500 − 16 920 = 580 hours. 580 × $15.84 [1] = $9 187.20 [1] Actual hours were fewer than budgeted, so overheads are under absorbed . [1] (Also accepted: (16 920 × $15.84) − $277 149 = $9 136.20 under absorbed, same marks.) (e) Gross margin 50% means selling price = 2 × total cost. Cost of the order Working $ Direct materials 800.00 Direct labour, Preparation 52 × $12.20 634.40 [1] Direct labour, Finishing 90 × $14.50 1 305.00 Overheads, Preparation (machine hours) 140 × $15.84 2 217.60 [1] Overheads, Finishing (labour hours) 90 × $5.02 451.80 [1] Total costs 5 408.80 [1] Profit (50% of selling price) = total cost 5 408.80 [1] Selling price 2 × $5 408.80 10 817.60 [1] (f) For switching to JIT (give three points): Improved cash flow as less money is tied up in inventory. [1] Reduced storage costs. [1] Less chance of wastage , damaged goods or out-of-date items. [1] Against switching (maximum 3; give three of these): Risk of stock-outs or production stopping if deliveries are late. [1] Over-reliance on a supplier , or the need for new suppliers. [1] Possible loss of trade discounts from smaller orders, or more delivery and inspection costs . [1] Advice: decide one way and support it with a comment, for example: switch to JIT only if suppliers are reliable, because the savings in storage and tied-up cash are worth it. [1] KEY IDEA Apportion shared overheads on a fair basis, then absorb them into products with a rate per hour. TOTAL 30 marks Official mark scheme VIDEO ▶ Starts at Q4 (1:50:08) Starts at Q4 (1:50:08) · by Sir Waleed Khanzada. Tap the picture to open it on YouTube.