9706/21/O/N/24 question 4: worked solution (October/November 2024, paper 21)
Show as plain textHide plain text
Cambridge AS Level Accounting 9706 · 2.2 Traditional costing methods Worked solution from the Cost and management accounting (AS Level) Theory (Paper 2) booklet, Part 2 of 2. Q39 9706/21/O/N/24 original Q4 Structured · 30 marks Worked solution (a) (i) A cost centre is a production location where costs may be attributed to cost units. [1] (ii) A cost unit is a unit of production that absorbs the cost centre's overhead costs. [1] (iii) A direct cost is one that can be specifically associated with the manufacture of one unit of production. [1] (iv) An indirect cost is one that cannot economically be specifically associated with the manufacture of one unit of production. [1] (b) Bases: light and heat by floor area (10 000 square metres in total); production supervisors' wages by number of employees in the two production departments (6 and 10); canteen by number of employees (20 in total); stores by stores requisitions (3 600 and 5 400). Details Total $ Machining $ Finishing $ Stores $ Canteen $ Allocated overheads 512 100 195 200 234 700 66 400 15 800 Light and heat 12 800 3 840 6 400 1 920 640 [1] Production supervisors' wages 42 000 15 750 26 250 – – [1] Total overheads 566 900 214 790 267 350 68 320 16 440 Reapportion Canteen 4 932 8 220 3 288 (16 440) [1] Subtotal 219 722 275 570 71 608 – Reapportion Stores 28 643 42 965 (71 608) – [1] Total 248 365 318 535 – – [2] (c) Rate = overheads ÷ hours, using own figures from (b). Machining uses machine hours (28 900); Finishing uses direct labour hours (18 500). Machining = $248 365 ÷ 28 900 = $8.59 per machine hour [1] Finishing = $318 535 ÷ 18 500 = $17.22 per direct labour hour [1] (d) Overhead absorbed = actual hours × rate; compare with actual overheads. Machining: $8.59 × 26 880 = $230 899. $230 899 − $249 200 = $18 301 [1] under absorbed [1] Finishing: $17.22 × 18 650 = $321 153. $321 153 − $320 400 = $753 [1] over absorbed [1] (e)(i) (i) Budgeted hourly direct labour rate = budgeted labour cost ÷ budgeted direct labour hours. Machining = $127 270 ÷ 14 300 hours = $8.90 per hour [1] Finishing = $183 150 ÷ 18 500 hours = $9.90 per hour [1] (e)(ii) Gross margin 40% means selling price = cost ÷ 0.60. Cost for one unit first, then 12 units. Cost per unit Working $ Direct material 4 metres × $3.85 15.40 [1] Direct labour, Machining 0.75 × $8.90 6.68 [1] Direct labour, Finishing 1.5 × $9.90 14.85 [1] Overheads, Machining 0.5 × $8.59 4.30 [1] Overheads, Finishing 1 × $17.22 17.22 [1] Total cost 58.45 [1] Profit margin (40% of price) $97.42 − $58.45 38.97 Price per unit $58.45 ÷ 0.60 97.42 Quotation 12 × $97.42 1 169.04 [1] (f) Give financial and non-financial points (any four in all), then your advice. Financial: Alberto will still make a profit on the work. After the 20% discount the price is $1 169.04 × 0.80 = $935.23, against costs of $701.40. [1] Financial: the margin is then 25%, which fails to reach the target margin of 40% . [1] Non-financial: the work uses spare capacity and gives employees less down-time, a positive effect. [1] Non-financial: existing customers may be upset if they find out about the discount. [1] Also accepted: overheads will be under absorbed because the price is lower. Advice: accept the terms, because the factory has spare capacity and the work still makes a profit, but the lower margin should be kept to this order only. [1] KEY IDEA Absorb overheads with a rate per hour, then price a job by adding the profit margin to total cost. TOTAL 30 marks Official mark scheme VIDEO ▶ Starts at Q4 (1:55:52) Starts at Q4 (1:55:52) · by Sir Waleed Khanzada. Tap the picture to open it on YouTube.