Worked solution from the Cost and management accounting (AS Level) Theory (Paper 2) booklet, Part 2 of 2.
(i) Allocation: overhead expenses that are directly attributed [1]
to a specific cost centre. [1]
(ii) Apportionment: overhead expenses are shared between different departments [1]
using a suitable basis. [1]
Bases: electricity by power (kilowatt hours, 42 000 in total); rent by floor area (4 400 square metres in total); canteen by number of employees; stores by issues from stores.
| Details | Total $ | Preparation $ | Finishing $ | Stores $ | Canteen $ |
|---|---|---|---|---|---|
| Overheads allocated | 272 120 | 184 100 | 60 800 | 10 960 | 16 260 |
| Electricity | 63 000 | 48 000 | 12 000 | 600 | 2 400 [1] |
| Rent | 44 000 | 24 000 | 18 000 | 500 | 1 500 [1] |
| Total overheads | 379 120 | 256 100 | 90 800 | 12 060 | 20 160 |
| Apportion canteen | – | 11 520 | 7 200 | 1 440 | (20 160) [1] |
| Subtotal | 379 120 | 267 620 | 98 000 | 13 500 | – |
| Apportion stores | – | 9 529 | 3 971 | (13 500) | – [1] |
| Subtotal | 379 120 | 277 149 | 101 971 | – | – [2] |
Overhead absorption rate = overheads ÷ hours. Preparation uses machine hours; Finishing uses labour hours.
Preparation = $277 149 ÷ 17 500 = $15.837, so $15.84 [1]
per machine hour [1]
Finishing = $101 971 ÷ 20 300 = $5.023, so $5.02 [1]
per labour hour [1]
Overhead absorbed = actual hours × rate. The budgeted hours were 17 500 and the actual hours were 16 920, so the difference is 17 500 − 16 920 = 580 hours.
580 × $15.84 [1]
= $9 187.20 [1]
Actual hours were fewer than budgeted, so overheads are under absorbed. [1]
(Also accepted: (16 920 × $15.84) − $277 149 = $9 136.20 under absorbed, same marks.)
Gross margin 50% means selling price = 2 × total cost.
| Cost of the order | Working | $ |
|---|---|---|
| Direct materials | 800.00 | |
| Direct labour, Preparation | 52 × $12.20 | 634.40 [1] |
| Direct labour, Finishing | 90 × $14.50 | 1 305.00 |
| Overheads, Preparation (machine hours) | 140 × $15.84 | 2 217.60 [1] |
| Overheads, Finishing (labour hours) | 90 × $5.02 | 451.80 [1] |
| Total costs | 5 408.80 [1] | |
| Profit (50% of selling price) | = total cost | 5 408.80 [1] |
| Selling price | 2 × $5 408.80 | 10 817.60 [1] |
For switching to JIT (give three points):
Improved cash flow as less money is tied up in inventory. [1]
Reduced storage costs. [1]
Less chance of wastage, damaged goods or out-of-date items. [1]
Against switching (maximum 3; give three of these):
Risk of stock-outs or production stopping if deliveries are late. [1]
Over-reliance on a supplier, or the need for new suppliers. [1]
Possible loss of trade discounts from smaller orders, or more delivery and inspection costs. [1]
Advice: decide one way and support it with a comment, for example: switch to JIT only if suppliers are reliable, because the savings in storage and tied-up cash are worth it. [1]
▶ Starts at Q4 (1:50:08)
Starts at Q4 (1:50:08) · by Sir Waleed Khanzada. Tap the picture to open it on YouTube.
Solutions follow the official Cambridge mark schemes; marks are shown in grey. Videos are from other YouTube channels. Paper codes read component / series / year: M/J = May/June, O/N = October/November. Past-paper questions © UCLES, reproduced for classroom practice.