(a)

(i) Allocation: overhead expenses that are directly attributed [1]

to a specific cost centre. [1]

(ii) Apportionment: overhead expenses are shared between different departments [1]

using a suitable basis. [1]

(b)

Bases: electricity by power (kilowatt hours, 42 000 in total); rent by floor area (4 400 square metres in total); canteen by number of employees; stores by issues from stores.

DetailsTotal $Preparation $Finishing $Stores $Canteen $
Overheads allocated272 120184 10060 80010 96016 260
Electricity63 00048 00012 0006002 400 [1]
Rent44 00024 00018 0005001 500 [1]
Total overheads379 120256 10090 80012 06020 160
Apportion canteen–11 5207 2001 440(20 160) [1]
Subtotal379 120267 62098 00013 500–
Apportion stores–9 5293 971(13 500)– [1]
Subtotal379 120277 149101 971–– [2]

(c)

Overhead absorption rate = overheads ÷ hours. Preparation uses machine hours; Finishing uses labour hours.

Preparation = $277 149 ÷ 17 500 = $15.837, so $15.84 [1]

per machine hour [1]

Finishing = $101 971 ÷ 20 300 = $5.023, so $5.02 [1]

per labour hour [1]

(d)

Overhead absorbed = actual hours × rate. The budgeted hours were 17 500 and the actual hours were 16 920, so the difference is 17 500 − 16 920 = 580 hours.

580 × $15.84 [1]

= $9 187.20 [1]

Actual hours were fewer than budgeted, so overheads are under absorbed. [1]

(Also accepted: (16 920 × $15.84) − $277 149 = $9 136.20 under absorbed, same marks.)

(e)

Gross margin 50% means selling price = 2 × total cost.

Cost of the orderWorking$
Direct materials800.00
Direct labour, Preparation52 × $12.20634.40 [1]
Direct labour, Finishing90 × $14.501 305.00
Overheads, Preparation (machine hours)140 × $15.842 217.60 [1]
Overheads, Finishing (labour hours)90 × $5.02451.80 [1]
Total costs5 408.80 [1]
Profit (50% of selling price)= total cost5 408.80 [1]
Selling price2 × $5 408.8010 817.60 [1]

(f)

For switching to JIT (give three points):

Improved cash flow as less money is tied up in inventory. [1]

Reduced storage costs. [1]

Less chance of wastage, damaged goods or out-of-date items. [1]

Against switching (maximum 3; give three of these):

Risk of stock-outs or production stopping if deliveries are late. [1]

Over-reliance on a supplier, or the need for new suppliers. [1]

Possible loss of trade discounts from smaller orders, or more delivery and inspection costs. [1]

Advice: decide one way and support it with a comment, for example: switch to JIT only if suppliers are reliable, because the savings in storage and tied-up cash are worth it. [1]

KEY IDEAApportion shared overheads on a fair basis, then absorb them into products with a rate per hour.
TOTAL 30 marks

Official mark scheme

Mark scheme for 9706/23/M/J/24 question 4
VIDEO
▶ Starts at Q4 (1:50:08)

Starts at Q4 (1:50:08) · by Sir Waleed Khanzada. Tap the picture to open it on YouTube.

Solutions follow the official Cambridge mark schemes; marks are shown in grey. Videos are from other YouTube channels. Paper codes read component / series / year: M/J = May/June, O/N = October/November. Past-paper questions © UCLES, reproduced for classroom practice.