9708/33/O/N/22 question 14: worked solution (October/November 2022, paper 33)

Show as plain text

Cambridge A2 Level Economics 9708 · 8.1 Government policies to achieve efficient resource allocation and correct market failure Worked solution from the Government microeconomic intervention MCQ booklet. Q35 9708/33/O/N/22 original Q14 Multiple choice Worked solution The question asks which method has the least total cost once each tonne of pollution needs a $90 permit. Total cost = cost of production + (tonnes of pollution × $90). A: 320 + 3 × 90 = 320 + 270 = $590 B: 380 + 2 × 90 = 380 + 180 = $560 C: 480 + 1 × 90 = 480 + 90 = $570 D: 700 + 0 = $700 The lowest is $560, method B. So the answer is B . A is cheapest before permits, but its pollution makes it dearer than B after permits. KEY IDEA With a permit price, compare production cost plus permit cost, not production cost alone. ANSWER B VIDEO ▶ Whole paper Video solution of the whole paper · by qiphyedu. Tap the picture to open it on YouTube.