Worked solution from the Government microeconomic intervention MCQ booklet.
The question asks which method has the least total cost once each tonne of pollution needs a $90 permit.
Total cost = cost of production + (tonnes of pollution × $90).
A: 320 + 3 × 90 = 320 + 270 = $590
B: 380 + 2 × 90 = 380 + 180 = $560
C: 480 + 1 × 90 = 480 + 90 = $570
D: 700 + 0 = $700
The lowest is $560, method B.
So the answer is B.
A is cheapest before permits, but its pollution makes it dearer than B after permits.
▶ Whole paper
Video solution of the whole paper · by qiphyedu. Tap the picture to open it on YouTube.
Solutions follow the official Cambridge mark schemes. Videos are from other YouTube channels. Paper codes read component / series / year: M/J = May/June, O/N = October/November. Past-paper questions © UCLES, reproduced for classroom practice.