Cambridge A2 Level Economics 9708 · 8.1 Government policies to achieve efficient resource allocation and correct market failure

Q35 · 9708/33/O/N/22 Q14

Worked solution from the Government microeconomic intervention MCQ booklet.

Q359708/33/O/N/22original Q14Multiple choice
Question 14 from 9708/33/O/N/22

Worked solution

The question asks which method has the least total cost once each tonne of pollution needs a $90 permit.

Total cost = cost of production + (tonnes of pollution × $90).

A: 320 + 3 × 90 = 320 + 270 = $590

B: 380 + 2 × 90 = 380 + 180 = $560

C: 480 + 1 × 90 = 480 + 90 = $570

D: 700 + 0 = $700

The lowest is $560, method B.

So the answer is B.

A is cheapest before permits, but its pollution makes it dearer than B after permits.

KEY IDEAWith a permit price, compare production cost plus permit cost, not production cost alone.
ANSWER B
VIDEO
▶ Whole paper

Video solution of the whole paper · by qiphyedu. Tap the picture to open it on YouTube.

Solutions follow the official Cambridge mark schemes. Videos are from other YouTube channels. Paper codes read component / series / year: M/J = May/June, O/N = October/November. Past-paper questions © UCLES, reproduced for classroom practice.