9706/12/M/J/25 question 24: worked solution (May/June 2025, paper 12)

Show as plain text

Cambridge AS Level Accounting 9706 · 2.1 Costs and cost behaviour Worked solution from the Cost and management accounting (AS Level) MCQ booklet. Q83 9706/12/M/J/25 original Q24 Multiple choice Worked solution The question asks for the total fixed costs in July . Variable cost per unit stayed the same, and fixed costs rose by $1 000 in July. Total cost change = $86 000 − $76 000 = $10 000 The extra $10 000 = extra variable cost + the $1 000 rise in fixed cost, so extra variable cost = $9 000. Extra units = 10 000 − 8 000 = 2 000, so variable cost per unit = $9 000 ÷ 2 000 = $4.50 June fixed costs = $76 000 − (8 000 × $4.50) = $76 000 − $36 000 = $40 000 July fixed costs = $40 000 + $1 000 = $41 000 So the answer is C . B ($36 000) is June's variable cost. A is not from this working. D ($76 000) is June's total cost. KEY IDEA Remove the fixed-cost rise from the cost change before finding the variable cost per unit. ANSWER C VIDEO ▶ Starts at Q24 (40:38) Starts at Q24 (40:38) · by Study with Prashna. Tap the picture to open it on YouTube.