9708/11/M/J/22 question 1: worked solution (May/June 2022, paper 11)
Show as plain textHide plain text
Cambridge AS Level Economics 9708 · 1.5 Production possibility curves Worked solution from the Basic economic ideas and resource allocation MCQ booklet. Q124 9708/11/M/J/22 original Q1 Multiple choice Worked solution The question asks how much X is given up to produce the amount of Y at point P. Read the graph: the maximum X is 150 (where the curve meets the X axis). At P, X is 100 (the dashed line down to the X axis), and Y is a little over 100. X given up = 150 − 100 = 50 . So the answer is B . C is the amount of X still produced at P, not what was given up. D is close to the amount of Y at P, not an amount of X. A does not match any reading of the graph. KEY IDEA The cost of producing more Y is the X given up: maximum X minus X at P. ANSWER B VIDEO ▶ Whole paper Video solution of the whole paper · by MAERIFAT QIMA. Tap the picture to open it on YouTube.