9708/12/F/M/22 question 4: worked solution (February/March 2022, paper 12)

Show as plain text

Cambridge AS Level Economics 9708 · 1.5 Production possibility curves Worked solution from the Basic economic ideas and resource allocation MCQ booklet. Q123 9708/12/F/M/22 original Q4 Multiple choice Worked solution The question asks which PPC has the lowest opportunity cost of producing wheat . Opportunity cost of one tonne of wheat = rice given up ÷ wheat gained. Read each straight-line PPC from the graph. A: 40 tonnes rice for 1 tonne wheat = 40 rice per wheat. B: 40 tonnes rice for 4 tonnes wheat = 10 rice per wheat. C: 80 tonnes rice for 6 tonnes wheat = 13.3 rice per wheat. D: 120 tonnes rice for 6 tonnes wheat = 20 rice per wheat. The lowest is B at 10 tonnes of rice per tonne of wheat. So the answer is B . A , C and D each give up more rice for every tonne of wheat. KEY IDEA Opportunity cost of wheat is the rice given up per tonne of wheat gained; the fewer tonnes of rice given up, the lower the cost. ANSWER B VIDEO ▶ Whole paper Video solution of the whole paper · by Adil Usman. Tap the picture to open it on YouTube.