The question asks which PPC has the lowest opportunity cost of producing wheat.

Opportunity cost of one tonne of wheat = rice given up ÷ wheat gained. Read each straight-line PPC from the graph.

A: 40 tonnes rice for 1 tonne wheat = 40 rice per wheat.

B: 40 tonnes rice for 4 tonnes wheat = 10 rice per wheat.

C: 80 tonnes rice for 6 tonnes wheat = 13.3 rice per wheat.

D: 120 tonnes rice for 6 tonnes wheat = 20 rice per wheat.

The lowest is B at 10 tonnes of rice per tonne of wheat.

So the answer is B.

A, C and D each give up more rice for every tonne of wheat.

KEY IDEAOpportunity cost of wheat is the rice given up per tonne of wheat gained; the fewer tonnes of rice given up, the lower the cost.
ANSWER B