Cambridge AS Level Economics 9708 · 1.5 Production possibility curves

Q124 · 9708/11/M/J/22 Q1

Worked solution from the Basic economic ideas and resource allocation MCQ booklet.

Q1249708/11/M/J/22original Q1Multiple choice
Question 1 from 9708/11/M/J/22

Worked solution

The question asks how much X is given up to produce the amount of Y at point P.

Read the graph: the maximum X is 150 (where the curve meets the X axis). At P, X is 100 (the dashed line down to the X axis), and Y is a little over 100.

X given up = 150 − 100 = 50.

So the answer is B.

C is the amount of X still produced at P, not what was given up. D is close to the amount of Y at P, not an amount of X. A does not match any reading of the graph.

KEY IDEAThe cost of producing more Y is the X given up: maximum X minus X at P.
ANSWER B
VIDEO
▶ Whole paper

Video solution of the whole paper · by MAERIFAT QIMA. Tap the picture to open it on YouTube.

Solutions follow the official Cambridge mark schemes. Videos are from other YouTube channels. Paper codes read component / series / year: M/J = May/June, O/N = October/November. Past-paper questions © UCLES, reproduced for classroom practice.