9706/42/O/N/25 question 2: worked solution (October/November 2025, paper 42)
Show as plain textHide plain text
Cambridge A2 Level Accounting 9706 · 4.2 Standard costing Worked solution from the Cost and management accounting (A Level) Theory (Paper 4) booklet, Part 2 of 4. Q36 9706/42/O/N/25 original Q2 Structured · 25 marks Worked solution (a) Fixed budget = the standards at 8 000 units. Labour hours = 8 000 × 3 = 24 000. Fixed budget for August $ Sales (8 000 × $82) 656 000 Direct material (8 000 × 4 kilos × $5) (160 000) Direct labour (8 000 × 3 hours × $15) (360 000) [1] Fixed overhead (24 000 hours × $2.80) (67 200) [1] Budgeted profit 68 800 [1] (b) A flexible budget lets the business prepare a budget based on the actual level of activity . [1] It makes variance analysis possible, because the actual result is compared with a budget at the same activity level. [1] (c)(i) Fixed overhead expenditure variance = budgeted fixed overhead − actual fixed overhead = $67 200 − $66 000 = $1 200 [1] = $1 200 favourable (actual cost was lower) [1] (c)(ii) Fixed overhead volume variance = (budgeted hours − standard hours for actual output) × standard rate per hour = (24 000 − (7 500 × 3)) × $2.80 [1] = 1 500 hours × $2.80 = $4 200 [1] = $4 200 adverse (output was below budget) [1] (d)(i) Write about the direct material variance: There is no material price variance , [1] because the actual price paid ($168 750 ÷ 33 750 kilos = $5) was the same as the standard price. [1] The material usage variance is $18 750 adverse . [1] This may be due to low quality material, more wastage or inefficient use by labour (any one). [1] (d)(ii) Write about the direct labour variance: The labour rate variance is $12 000 adverse . [1] This may be due to inflation raising the hourly rate. [1] The labour efficiency variance is $22 500 adverse . [1] This may be due to an inefficient labour force, low quality material, lack of training or low motivation (any one). [1] (e) For switching , any three: The quality of material should be better. [1] There is likely to be less wastage . [1] Returns of materials can be reduced. [1] Against switching , any three: Changing supplier may not solve labour inefficiency . [1] Transport costs, import duties or exchange rate changes may erode profit. [1] Delivery from overseas takes time . [1] Also accepted (no extra mark): it takes time to build a good relationship with a new supplier. Decision: advise switching or not, with a supporting comment, for example: do not switch yet, because the labour variance is also large and a higher price may erode profit. [1] KEY IDEA Flex the budget to the actual activity, then split the difference to actual profit into price, usage, efficiency and overhead variances. TOTAL 25 marks Official mark scheme VIDEO ▶ Topic lesson A lesson on this topic · by Edex World. Tap the picture to open it on YouTube.