Worked solution from the Cost and management accounting (A Level) Theory (Paper 4) booklet, Part 2 of 4.
Fixed budget = the standards at 8 000 units. Labour hours = 8 000 × 3 = 24 000.
| Fixed budget for August | $ |
|---|---|
| Sales (8 000 × $82) | 656 000 |
| Direct material (8 000 × 4 kilos × $5) | (160 000) |
| Direct labour (8 000 × 3 hours × $15) | (360 000) [1] |
| Fixed overhead (24 000 hours × $2.80) | (67 200) [1] |
| Budgeted profit | 68 800 [1] |
A flexible budget lets the business prepare a budget based on the actual level of activity. [1]
It makes variance analysis possible, because the actual result is compared with a budget at the same activity level. [1]
Fixed overhead expenditure variance = budgeted fixed overhead − actual fixed overhead
= $67 200 − $66 000 = $1 200 [1]
= $1 200 favourable (actual cost was lower) [1]
Fixed overhead volume variance = (budgeted hours − standard hours for actual output) × standard rate per hour
= (24 000 − (7 500 × 3)) × $2.80 [1]
= 1 500 hours × $2.80 = $4 200 [1]
= $4 200 adverse (output was below budget) [1]
Write about the direct material variance:
There is no material price variance, [1]
because the actual price paid ($168 750 ÷ 33 750 kilos = $5) was the same as the standard price. [1]
The material usage variance is $18 750 adverse. [1]
This may be due to low quality material, more wastage or inefficient use by labour (any one). [1]
Write about the direct labour variance:
The labour rate variance is $12 000 adverse. [1]
This may be due to inflation raising the hourly rate. [1]
The labour efficiency variance is $22 500 adverse. [1]
This may be due to an inefficient labour force, low quality material, lack of training or low motivation (any one). [1]
For switching, any three:
The quality of material should be better. [1]
There is likely to be less wastage. [1]
Returns of materials can be reduced. [1]
Against switching, any three:
Changing supplier may not solve labour inefficiency. [1]
Transport costs, import duties or exchange rate changes may erode profit. [1]
Delivery from overseas takes time. [1]
Also accepted (no extra mark): it takes time to build a good relationship with a new supplier.
Decision: advise switching or not, with a supporting comment, for example: do not switch yet, because the labour variance is also large and a higher price may erode profit. [1]
▶ Topic lesson
A lesson on this topic · by Edex World. Tap the picture to open it on YouTube.
Solutions follow the official Cambridge mark schemes; marks are shown in grey. Videos are from other YouTube channels. Paper codes read component / series / year: M/J = May/June, O/N = October/November. Past-paper questions © UCLES, reproduced for classroom practice.