9706/12/O/N/25 question 25: worked solution (October/November 2025, paper 12)
Show as plain textHide plain text
Cambridge AS Level Accounting 9706 · 2.2 Traditional costing methods Worked solution from the Cost and management accounting (AS Level) MCQ booklet. Q329 9706/12/O/N/25 original Q25 Multiple choice Worked solution The question asks which overhead absorption rate would have been used. A predetermined rate uses budgeted figures. A cutting department works mainly with machines, so machine hours are the sensible basis. Budgeted overheads = $40 000 Budgeted machine hours = 2 800, so rate = $40 000 ÷ 2 800 = $14.29 per machine hour The actual figures ($44 000, 2 700, 2 900) are not used in setting a predetermined rate. So the answer is A . B and C use labour hours, which suit a cutting department less well than machine hours. D uses the actual overhead and actual machine hours ($44 000 ÷ 2 700), which a predetermined rate does not use. KEY IDEA A predetermined rate = budgeted overheads ÷ budgeted hours; actual figures are not used. ANSWER A VIDEO ▶ Starts at Q25 (41:56) Starts at Q25 (41:56) · by Study with Prashna. Tap the picture to open it on YouTube.