9706/22/M/J/21 question 4: worked solution (May/June 2021, paper 22)

Show as plain text

Cambridge AS Level Accounting 9706 · 2.2 Traditional costing methods Worked solution from the Cost and management accounting (AS Level) Theory (Paper 2) booklet, Part 2 of 2. Q13 9706/22/M/J/21 original Q4 Structured · 30 marks Worked solution (a) Share the canteen overheads ( $15 400 ) first: Assembly 50%, Finishing 40%, Administration 10%. Then share the administration total (its own $28 300 plus its canteen share) between Assembly 75% and Finishing 25%. Reapportionment of service department overheads, February 2021 Details Assembly $ Finishing $ Administration $ Canteen $ Overheads 83 500 70 100 28 300 15 400 Reapportion canteen (50%, 40%, 10%) 7 700 6 160 1 540 (15 400) [1] Subtotal 91 200 76 260 29 840 - [1] Reapportion administration (75%, 25%) 22 380 7 460 (29 840) - [1] Total overheads 113 580 83 720 - - [1] (b) Overhead absorption rate = total overheads ÷ the basis of absorption. Assembly is machine based; Finishing is labour based. Use the totals from (a). Assembly: $113 580 ÷ 2 800 machine hours = $40.56 per machine hour [2] Finishing: $83 720 ÷ 1 400 direct labour hours = $59.80 per direct labour hour [2] (c) Work out the total cost first. Then, because profit is 40% of the selling price , the cost is the other 60%. Details $ Direct materials 1 880 Direct labour: Assembly 11.5 × $8.40 96.60 [1] Direct labour: Finishing 6.1 × $8.20 50.02 [1] Overheads: Assembly 5.7 machine hours × $40.56 231.19 [1] Overheads: Finishing 6.1 labour hours × $59.80 364.78 [1] Total cost 2 622.59 [1] Profit 40% of selling price = $2 622.59 × 40/60 1 748.39 [1] Selling price to quote 4 370.98 [1] (d) Write any two of these causes of under absorption (overheads absorbed are less than the overheads actually spent): Actual overheads were more than budgeted. [1] Actual production (or hours) was less than budgeted. [1] (e) (i) Allocation is where an overhead can be directly attributed to one cost centre . [1] (ii) Apportionment is where a cost must be divided between cost centres on a suitable basis . [1] (f) Find the cost per unit. Normal labour cost per unit = $x. Overtime units cost 1.25x, so 8 000x + 1 000 × 1.25x = $74 000, giving 9 250x = $74 000 and x = $8.00 per unit. Other variable costs: $22 500 ÷ 9 000 = $2.50 per unit . Details $ Revenue 7 600 × $30 228 000 Direct materials 7 600 × $5.50 (41 800) Direct labour 7 600 × $8.00 (60 800) [1] Other variable costs 7 600 × $2.50 (19 000) [1] Contribution 106 400 Fixed costs (65 000) [1] Profit for the month 41 400 [1] Accepted alternative: contribution per unit $30.00 − $5.50 − $8.00 − $2.50 = $14.00; × 7 600 = $106 400; less fixed costs $65 000 = $41 400. (g) Give points for changing, points against, then the decision. For changing supplier (any three points in all): profit or contribution will be greater ($41 400 a month, against $36 500 now: $270 000 − $233 500). [1] The business will not have to rely on overtime working, which reduces costs. [1] A better working relationship with a sole supplier. [1] Against changing supplier: will the quality of materials be lower? [1] Will there be supply problems when delivering from overseas, or will the new supplier be reliable ? [1] Will the lower output (7 600 units) lose regular orders or lead to redundancies ? [1] Advice: write a clear decision that fits your points, for example change supplier, because profit is higher and overtime is no longer needed. [1] KEY IDEA Share service department costs first, absorb them using machine or labour hours, and add profit on selling price by dividing cost by (100% − profit %). TOTAL 30 marks Official mark scheme VIDEO ▶ Starts at Q4 (1:18:26) Starts at Q4 (1:18:26) · by Class of Rohail Ahmed. Tap the picture to open it on YouTube.