Cambridge AS Level Accounting 9706 · 2.2 Traditional costing methods

Q13 · 9706/22/M/J/21 Q4

Worked solution from the Cost and management accounting (AS Level) Theory (Paper 2) booklet, Part 2 of 2.

Q139706/22/M/J/21original Q4Structured · 30 marks
Question 4 from 9706/22/M/J/21

Worked solution

(a)

Share the canteen overheads ($15 400) first: Assembly 50%, Finishing 40%, Administration 10%. Then share the administration total (its own $28 300 plus its canteen share) between Assembly 75% and Finishing 25%.

Reapportionment of service department overheads, February 2021

DetailsAssembly $Finishing $Administration $Canteen $
Overheads83 50070 10028 30015 400
Reapportion canteen (50%, 40%, 10%)7 7006 1601 540(15 400) [1]
Subtotal91 20076 26029 840- [1]
Reapportion administration (75%, 25%)22 3807 460(29 840)- [1]
Total overheads113 58083 720-- [1]

(b)

Overhead absorption rate = total overheads ÷ the basis of absorption. Assembly is machine based; Finishing is labour based. Use the totals from (a).

Assembly: $113 580 ÷ 2 800 machine hours

= $40.56 per machine hour [2]

Finishing: $83 720 ÷ 1 400 direct labour hours

= $59.80 per direct labour hour [2]

(c)

Work out the total cost first. Then, because profit is 40% of the selling price, the cost is the other 60%.

Details$
Direct materials1 880
Direct labour: Assembly 11.5 × $8.4096.60 [1]
Direct labour: Finishing 6.1 × $8.2050.02 [1]
Overheads: Assembly 5.7 machine hours × $40.56231.19 [1]
Overheads: Finishing 6.1 labour hours × $59.80364.78 [1]
Total cost2 622.59 [1]
Profit 40% of selling price = $2 622.59 × 40/601 748.39 [1]
Selling price to quote4 370.98 [1]

(d)

Write any two of these causes of under absorption (overheads absorbed are less than the overheads actually spent):

Actual overheads were more than budgeted. [1]

Actual production (or hours) was less than budgeted. [1]

(e)

(i) Allocation is where an overhead can be directly attributed to one cost centre. [1]

(ii) Apportionment is where a cost must be divided between cost centres on a suitable basis. [1]

(f)

Find the cost per unit. Normal labour cost per unit = $x. Overtime units cost 1.25x, so 8 000x + 1 000 × 1.25x = $74 000, giving 9 250x = $74 000 and x = $8.00 per unit. Other variable costs: $22 500 ÷ 9 000 = $2.50 per unit.

Details$
Revenue 7 600 × $30228 000
Direct materials 7 600 × $5.50(41 800)
Direct labour 7 600 × $8.00(60 800) [1]
Other variable costs 7 600 × $2.50(19 000) [1]
Contribution106 400
Fixed costs(65 000) [1]
Profit for the month41 400 [1]

Accepted alternative: contribution per unit $30.00 − $5.50 − $8.00 − $2.50 = $14.00; × 7 600 = $106 400; less fixed costs $65 000 = $41 400.

(g)

Give points for changing, points against, then the decision.

For changing supplier (any three points in all): profit or contribution will be greater ($41 400 a month, against $36 500 now: $270 000 − $233 500). [1]

The business will not have to rely on overtime working, which reduces costs. [1]

A better working relationship with a sole supplier. [1]

Against changing supplier: will the quality of materials be lower? [1]

Will there be supply problems when delivering from overseas, or will the new supplier be reliable? [1]

Will the lower output (7 600 units) lose regular orders or lead to redundancies? [1]

Advice: write a clear decision that fits your points, for example change supplier, because profit is higher and overtime is no longer needed. [1]

KEY IDEAShare service department costs first, absorb them using machine or labour hours, and add profit on selling price by dividing cost by (100% − profit %).
TOTAL 30 marks

Official mark scheme

Mark scheme for 9706/22/M/J/21 question 4
VIDEO
▶ Starts at Q4 (1:18:26)

Starts at Q4 (1:18:26) · by Class of Rohail Ahmed. Tap the picture to open it on YouTube.

Solutions follow the official Cambridge mark schemes; marks are shown in grey. Videos are from other YouTube channels. Paper codes read component / series / year: M/J = May/June, O/N = October/November. Past-paper questions © UCLES, reproduced for classroom practice.