9706/31/M/J/22 question 5: worked solution (May/June 2022, paper 31)
Show as plain textHide plain text
Cambridge A2 Level Accounting 9706 · 4.1 Activity based costing (ABC) Worked solution from the Cost and management accounting (A Level) Theory (Paper 3) booklet, Part 1 of 4. Q7 9706/31/M/J/22 original Q5 Structured · 25 marks Worked solution (a) Total cost per unit = direct materials + direct labour + factory overheads. Overheads are shared on direct labour hours. Working 1: overhead per labour hour Total labour hours = 24 000 × 4 + 15 000 × 6 = 96 000 + 90 000 = 186 000 $465 000 ÷ 186 000 = $2.50 per labour hour [1] Product S: $2.50 × 4 = $10 [1] Product P: $2.50 × 6 = $15 [1] Per unit Product S $ Product P $ Direct materials (1 × $8; 2 × $8.50) 8 17 [1] Direct labour (4 × $15; 6 × $18) 60 108 [1] Factory overheads (W1) 10 15 Total cost per unit 78 140 [1] Mark-up 50% 39 70 [1] Selling price 117 210 [1] (b) Write: activity based costing assigns costs to products based on the activities that use up the resources . [1] Activities are used as cost pools , and the costs are shared to products using a cost driver . [1] A cost driver is the factor that has a direct cause and effect link with the resources used. [1] (c) Working 1: overheads shared by cost driver (total usage: orders 24 + 8 = 32; machine hours 36 000 + 18 000 = 54 000; setups 40 + 8 = 48; inspection hours 400 + 100 = 500) Activity Product S $ Product P $ Purchasing materials ($120 000 × 24/32; × 8/32) 90 000 30 000 [1] Machine running ($162 000 × 36 000/54 000; × 18 000/54 000) 108 000 54 000 [1] Machine setups ($72 000 × 40/48; × 8/48) 60 000 12 000 [1] Inspecting ($111 000 × 400/500; × 100/500) 88 800 22 200 [1] Total overheads 346 800 118 200 Total cost Product S $ Product P $ Direct materials (24 000 × $8; 15 000 × $17) 192 000 255 000 Direct labour (24 000 × $60; 15 000 × $108) 1 440 000 1 620 000 [1] Factory overheads (W1) 346 800 118 200 Total cost 1 978 800 1 993 200 [1] Per unit Product S $ Product P $ Total cost per unit (÷ 24 000; ÷ 15 000) 82.45 132.88 [1] Mark-up 50% 41.23 66.44 [1] Selling price 123.68 199.32 [1] (d) Points for adopting ABC (write any two): ABC gives more accurate, realistic cost information . Overhead per unit for Product P was $15, higher than Product S at $10; with ABC, Product S is $14.45 and Product P is $7.88. [1] Accurate cost information gives better pricing decisions . Selling prices were $117 (S) and $210 (P); with ABC they are $123.68 and $199.32. Product S goes up because it has the higher overhead per unit. [1] Points against adopting ABC (write any two): ABC is costly to implement : it needs specialists and the staff need training. [1] ABC is time consuming . [1] Decision: write a clear decision, either to adopt ABC or not, supported by your points. [1] KEY IDEA Activity based costing shares overheads by what causes them, so it can change the cost and price of each product. TOTAL 25 marks Official mark scheme VIDEO ▶ Whole paper Video solution of the whole paper · by Edex World. Tap the picture to open it on YouTube.