Worked solution from the Cost and management accounting (A Level) Theory (Paper 3) booklet, Part 1 of 4.
Total cost per unit = direct materials + direct labour + factory overheads. Overheads are shared on direct labour hours.
Working 1: overhead per labour hour
Total labour hours = 24 000 × 4 + 15 000 × 6 = 96 000 + 90 000 = 186 000
$465 000 ÷ 186 000 = $2.50 per labour hour [1]
Product S: $2.50 × 4 = $10 [1]
Product P: $2.50 × 6 = $15 [1]
| Per unit | Product S $ | Product P $ |
|---|---|---|
| Direct materials (1 × $8; 2 × $8.50) | 8 | 17 [1] |
| Direct labour (4 × $15; 6 × $18) | 60 | 108 [1] |
| Factory overheads (W1) | 10 | 15 |
| Total cost per unit | 78 | 140 [1] |
| Mark-up 50% | 39 | 70 [1] |
| Selling price | 117 | 210 [1] |
Write: activity based costing assigns costs to products based on the activities that use up the resources. [1]
Activities are used as cost pools, and the costs are shared to products using a cost driver. [1]
A cost driver is the factor that has a direct cause and effect link with the resources used. [1]
Working 1: overheads shared by cost driver (total usage: orders 24 + 8 = 32; machine hours 36 000 + 18 000 = 54 000; setups 40 + 8 = 48; inspection hours 400 + 100 = 500)
| Activity | Product S $ | Product P $ |
|---|---|---|
| Purchasing materials ($120 000 × 24/32; × 8/32) | 90 000 | 30 000 [1] |
| Machine running ($162 000 × 36 000/54 000; × 18 000/54 000) | 108 000 | 54 000 [1] |
| Machine setups ($72 000 × 40/48; × 8/48) | 60 000 | 12 000 [1] |
| Inspecting ($111 000 × 400/500; × 100/500) | 88 800 | 22 200 [1] |
| Total overheads | 346 800 | 118 200 |
| Total cost | Product S $ | Product P $ |
|---|---|---|
| Direct materials (24 000 × $8; 15 000 × $17) | 192 000 | 255 000 |
| Direct labour (24 000 × $60; 15 000 × $108) | 1 440 000 | 1 620 000 [1] |
| Factory overheads (W1) | 346 800 | 118 200 |
| Total cost | 1 978 800 | 1 993 200 [1] |
| Per unit | Product S $ | Product P $ |
|---|---|---|
| Total cost per unit (÷ 24 000; ÷ 15 000) | 82.45 | 132.88 [1] |
| Mark-up 50% | 41.23 | 66.44 [1] |
| Selling price | 123.68 | 199.32 [1] |
Points for adopting ABC (write any two):
ABC gives more accurate, realistic cost information. Overhead per unit for Product P was $15, higher than Product S at $10; with ABC, Product S is $14.45 and Product P is $7.88. [1]
Accurate cost information gives better pricing decisions. Selling prices were $117 (S) and $210 (P); with ABC they are $123.68 and $199.32. Product S goes up because it has the higher overhead per unit. [1]
Points against adopting ABC (write any two):
ABC is costly to implement: it needs specialists and the staff need training. [1]
ABC is time consuming. [1]
Decision: write a clear decision, either to adopt ABC or not, supported by your points. [1]