9709/42/F/M/22 question 1: worked solution (February/March 2022, paper 42)
Show as plain textHide plain text
Cambridge AS Level Mathematics 9709 · 13.1 Work done by a force Worked solution from the Energy, work and power Paper 4 Mechanics booklet, Part 1 of 3. Q3 9709/42/F/M/22 original Q1 Structured · 4 marks Worked solution (a) The crane lifts the block at constant speed, so it does work to raise the block plus work against resistance. Gain in PE = 600 × 10 × 15 = 90000 J [1] Total work = 90000 + 10000 = 100000 J [1] (b) Work done = power × time. 100000 = 12500 × t [1] t = 8 s [1] KEY IDEA At constant speed there is no change in KE, so the work done is the PE gained plus the work against resistance. Time = work ÷ power. TOTAL 4 marks Official mark scheme VIDEO ▶ Whole paper Video solution of the whole paper · by Math UNITED. Tap the picture to open it on YouTube.