Cambridge AS Level Mathematics 9709 · 13.1 Work done by a force

Q3 · 9709/42/F/M/22 Q1

Worked solution from the Energy, work and power Paper 4 Mechanics booklet, Part 1 of 3.

Q39709/42/F/M/22original Q1Structured · 4 marks
Question 1 from 9709/42/F/M/22

Worked solution

(a)

The crane lifts the block at constant speed, so it does work to raise the block plus work against resistance.

Gain in PE = 600 × 10 × 15 = 90000 J [1]

Total work = 90000 + 10000 = 100000 J [1]

(b)

Work done = power × time.

100000 = 12500 × t [1]

t = 8 s [1]

KEY IDEAAt constant speed there is no change in KE, so the work done is the PE gained plus the work against resistance. Time = work ÷ power.
TOTAL 4 marks

Official mark scheme

Mark scheme for 9709/42/F/M/22 question 1
VIDEO
▶ Whole paper

Video solution of the whole paper · by Math UNITED. Tap the picture to open it on YouTube.

Solutions follow the official Cambridge mark schemes; marks are shown in grey. Videos are from other YouTube channels. Paper codes read component / series / year: M/J = May/June, O/N = October/November. Past-paper questions © UCLES, reproduced for classroom practice.