9706/11/M/J/21 question 24: worked solution (May/June 2021, paper 11)

Show as plain text

Cambridge AS Level Accounting 9706 · 2.2 Traditional costing methods Worked solution from the Cost and management accounting (AS Level) MCQ booklet. Q131 9706/11/M/J/21 original Q24 Multiple choice Worked solution The question asks how under-absorption can happen. It happens when overheads absorbed are less than overheads incurred. 1 is wrong: over-budgeting overheads makes the rate too high, so more is absorbed (over-absorption). 2 is correct: under-budgeted overheads make the rate too low, so too little is absorbed. 3 is correct: if production is less than budgeted, fewer hours or units are absorbed, so too little is recovered. 4 is wrong: more production than budgeted absorbs more. Correct: 2 and 3. So the answer is C . A , B and D each include 1 or 4, which cause over-absorption. KEY IDEA Under-absorption comes from budgeting too little overhead or producing less than budgeted. ANSWER C VIDEO ▶ Starts at Q24 (46:24) Starts at Q24 (46:24) · by Study with Prashna. Tap the picture to open it on YouTube.