Worked solution from the Cost and management accounting (AS Level) MCQ booklet.
The question asks how under-absorption can happen. It happens when overheads absorbed are less than overheads incurred.
1 is wrong: over-budgeting overheads makes the rate too high, so more is absorbed (over-absorption).
2 is correct: under-budgeted overheads make the rate too low, so too little is absorbed.
3 is correct: if production is less than budgeted, fewer hours or units are absorbed, so too little is recovered.
4 is wrong: more production than budgeted absorbs more.
Correct: 2 and 3.
So the answer is C.
A, B and D each include 1 or 4, which cause over-absorption.
▶ Starts at Q24 (46:24)
Starts at Q24 (46:24) · by Study with Prashna. Tap the picture to open it on YouTube.
Solutions follow the official Cambridge mark schemes. Videos are from other YouTube channels. Paper codes read component / series / year: M/J = May/June, O/N = October/November. Past-paper questions © UCLES, reproduced for classroom practice.