9706/13/O/N/23 question 26: worked solution (October/November 2023, paper 13)
Show as plain textHide plain text
Cambridge AS Level Accounting 9706 · 2.2 Traditional costing methods Worked solution from the Cost and management accounting (AS Level) MCQ booklet. Q252 9706/13/O/N/23 original Q26 Multiple choice Worked solution The question asks which statements about over and under absorption are correct. Over absorbed means overhead absorbed is more than actual; under absorbed means it is less. Absorbed overhead = actual activity × predetermined rate. Statement 1: actual activity below budget means less is absorbed, so the overhead is under absorbed. Statement 1 is wrong. Statement 2 is correct. Statement 3: actual overhead above budget means actual cost is more than what was absorbed, so it is under absorbed. Statement 3 is wrong. Statement 4 is correct. So the correct statements are 2 and 4. So the answer is D . A , B and C each include statement 1 or 3. KEY IDEA Lower activity or higher actual overhead than budgeted leads to under absorption. ANSWER D VIDEO ▶ Starts at Q26 (38:16) Starts at Q26 (38:16) · by Study with Prashna. Tap the picture to open it on YouTube.