9706/23/O/N/22 question 4: worked solution (October/November 2022, paper 23)

Show as plain text

Cambridge AS Level Accounting 9706 · 2.2 Traditional costing methods Worked solution from the Cost and management accounting (AS Level) Theory (Paper 2) booklet, Part 2 of 2. Q27 9706/23/O/N/22 original Q4 Structured · 30 marks Worked solution (a) Stores costs are shared on parts orders (Machining 6 400, Finishing 1 800, Maintenance 300 = 8 500). Maintenance costs, after receiving its share of Stores, are shared on call-outs (Machining 120, Finishing 30 = 150). Stores to Machining = $148 000 × 6 400/8 500 = $111 435. Stores to Finishing = $148 000 × 1 800/8 500 = $31 341. Stores to Maintenance = $148 000 × 300/8 500 = $5 224. Maintenance to Machining = $348 224 × 120/150 = $278 579. Maintenance to Finishing = $348 224 × 30/150 = $69 645. Details Total $ Machining $ Finishing $ Stores $ Maintenance $ Allocated overheads 803 900 288 500 515 400 – – Indirect labour 459 000 106 000 52 000 70 000 231 000 Other indirect costs 360 000 114 000 56 000 78 000 112 000 Total overheads 1 622 900 508 500 623 400 148 000 343 000 Reapportion Stores 111 435 31 341 (148 000) 5 224 [1] Sub-total 619 935 654 741 – 348 224 Reapportion Maintenance 278 579 69 645 – (348 224) [1] Total overheads 1 622 900 898 514 724 386 – – [2] (The [2] on the last row is one mark for each production department's total.) (b) Machining is mostly machine-based, so use machine hours ; Finishing is mostly labour-based, so use direct labour hours . Rate = total overheads ÷ budgeted hours Machining = $898 514 ÷ 48 000 = $18.72 per machine hour [2] Finishing = $724 386 ÷ 54 600 = $13.27 per direct labour hour [2] (c) Overheads absorbed = rate × actual hours; compare with actual overheads. Machining: $18.72 × 49 200 = $921 024; actual $910 000; difference = $11 024 over-absorbed [2] Finishing: $13.27 × 51 800 = $687 386; actual $705 000; difference = $17 614 under-absorbed [2] (d) Write two reasons: Actual overhead spending was higher than budgeted. [1] Actual output (activity) was lower than budgeted. [1] (e) Budgeted hours = 11 500 + 54 600 = 66 100 Rate = $594 900 ÷ 66 100 = $9 per direct labour hour [1] (f) Machining labour is paid at overtime: $9 × 125% = $11.25 per hour. Selling price = total cost + profit, where profit is 25% of selling price (so 25/75 of cost). Statement of the selling price for 50 units Details Working $ per unit Direct material 4 × $2.45 9.80 [1] Direct labour – Machining 3 × $11.25 33.75 Direct labour – Finishing 4.5 × $9 40.50 [1] Overheads – Machining 1.25 × $18.72 23.40 [1] Overheads – Finishing 2.5 × $13.27 33.18 [1] Total cost per unit 140.63 Details Working $ Total cost $140.63 × 50 7 031.50 [1] Profit $7 031.50 × 25/75 2 343.83 Total selling price 9 375.33 [1] (g) Write: if service department costs are not included , those costs would not be recovered [1] and the selling price would be wrong (too low). [1] (h) Advise: weigh the factory-wide rate against the present departmental rates, then decide. A factory-wide rate is easier to calculate , needing less detailed analysis. [1] But it is less accurate , [1] because some jobs need more labour hours or machine hours than others. [1] So there would be under- or over-absorption on each job . [1] If overheads are over-absorbed, the selling price may be too high , which may lower demand and so lower profits . [1] If overheads are under-absorbed, the price may be too low , so costs may not be covered and profit falls . [1] Decision: advise the directors not to change , because the departmental rates are more accurate and a wrong rate may reduce profits. [1] KEY IDEA Share service department costs to production departments, then absorb them with a rate suited to each department's work. TOTAL 30 marks Official mark scheme VIDEO ▶ Whole paper Video solution of the whole paper · by Abdul Rafay Subhan | O & A level Accounting & math. Tap the picture to open it on YouTube.