Cambridge AS Level Accounting 9706 · 2.2 Traditional costing methods

Q27 · 9706/23/O/N/22 Q4

Worked solution from the Cost and management accounting (AS Level) Theory (Paper 2) booklet, Part 2 of 2.

Q279706/23/O/N/22original Q4Structured · 30 marks
Question 4 from 9706/23/O/N/22

Worked solution

(a)

Stores costs are shared on parts orders (Machining 6 400, Finishing 1 800, Maintenance 300 = 8 500). Maintenance costs, after receiving its share of Stores, are shared on call-outs (Machining 120, Finishing 30 = 150).

Stores to Machining = $148 000 × 6 400/8 500 = $111 435. Stores to Finishing = $148 000 × 1 800/8 500 = $31 341. Stores to Maintenance = $148 000 × 300/8 500 = $5 224.

Maintenance to Machining = $348 224 × 120/150 = $278 579. Maintenance to Finishing = $348 224 × 30/150 = $69 645.

DetailsTotal $Machining $Finishing $Stores $Maintenance $
Allocated overheads803 900288 500515 400––
Indirect labour459 000106 00052 00070 000231 000
Other indirect costs360 000114 00056 00078 000112 000
Total overheads1 622 900508 500623 400148 000343 000
Reapportion Stores111 43531 341(148 000)5 224 [1]
Sub-total619 935654 741–348 224
Reapportion Maintenance278 57969 645–(348 224) [1]
Total overheads1 622 900898 514724 386–– [2]

(The [2] on the last row is one mark for each production department's total.)

(b)

Machining is mostly machine-based, so use machine hours; Finishing is mostly labour-based, so use direct labour hours.

Rate = total overheads ÷ budgeted hours

Machining = $898 514 ÷ 48 000 = $18.72 per machine hour [2]

Finishing = $724 386 ÷ 54 600 = $13.27 per direct labour hour [2]

(c)

Overheads absorbed = rate × actual hours; compare with actual overheads.

Machining: $18.72 × 49 200 = $921 024; actual $910 000; difference = $11 024 over-absorbed [2]

Finishing: $13.27 × 51 800 = $687 386; actual $705 000; difference = $17 614 under-absorbed [2]

(d)

Write two reasons:

Actual overhead spending was higher than budgeted. [1]

Actual output (activity) was lower than budgeted. [1]

(e)

Budgeted hours = 11 500 + 54 600 = 66 100

Rate = $594 900 ÷ 66 100 = $9 per direct labour hour [1]

(f)

Machining labour is paid at overtime: $9 × 125% = $11.25 per hour. Selling price = total cost + profit, where profit is 25% of selling price (so 25/75 of cost).

Statement of the selling price for 50 units

DetailsWorking$ per unit
Direct material4 × $2.459.80 [1]
Direct labour – Machining3 × $11.2533.75
Direct labour – Finishing4.5 × $940.50 [1]
Overheads – Machining1.25 × $18.7223.40 [1]
Overheads – Finishing2.5 × $13.2733.18 [1]
Total cost per unit140.63
DetailsWorking$
Total cost$140.63 × 507 031.50 [1]
Profit$7 031.50 × 25/752 343.83
Total selling price9 375.33 [1]

(g)

Write: if service department costs are not included, those costs would not be recovered [1]

and the selling price would be wrong (too low). [1]

(h)

Advise: weigh the factory-wide rate against the present departmental rates, then decide.

A factory-wide rate is easier to calculate, needing less detailed analysis. [1]

But it is less accurate, [1]

because some jobs need more labour hours or machine hours than others. [1]

So there would be under- or over-absorption on each job. [1]

If overheads are over-absorbed, the selling price may be too high, which may lower demand and so lower profits. [1]

If overheads are under-absorbed, the price may be too low, so costs may not be covered and profit falls. [1]

Decision: advise the directors not to change, because the departmental rates are more accurate and a wrong rate may reduce profits. [1]

KEY IDEAShare service department costs to production departments, then absorb them with a rate suited to each department's work.
TOTAL 30 marks

Official mark scheme

Mark scheme for 9706/23/O/N/22 question 4
VIDEO
▶ Whole paper

Video solution of the whole paper · by Abdul Rafay Subhan | O & A level Accounting & math. Tap the picture to open it on YouTube.

Solutions follow the official Cambridge mark schemes; marks are shown in grey. Videos are from other YouTube channels. Paper codes read component / series / year: M/J = May/June, O/N = October/November. Past-paper questions © UCLES, reproduced for classroom practice.