9706/12/F/M/21 question 21: worked solution (February/March 2021, paper 12)

Show as plain text

Cambridge AS Level Accounting 9706 · 2.1 Costs and cost behaviour Worked solution from the Cost and management accounting (AS Level) MCQ booklet. Q20 9706/12/F/M/21 original Q21 Multiple choice Worked solution The question asks what type of cost is basic wages plus a bonus linked to production targets. The basic wages are the same every week: a fixed part. The bonus changes with how well targets are met: a variable part. A cost with both fixed and variable parts is semi-variable . So the answer is B . A and D each show only one of the two parts. C is a cost that jumps in steps, which is not described. KEY IDEA A cost with a fixed part and a variable part is semi-variable. ANSWER B VIDEO ▶ Starts at Q21 (34:04) Starts at Q21 (34:04) · by Study with Prashna. Tap the picture to open it on YouTube.