Worked solution from the Cost and management accounting (AS Level) Theory (Paper 2) booklet, Part 2 of 2.
Write any three benefits of break-even analysis.
It identifies the point at which the product starts to make a profit. [1]
It identifies the margin of safety. [1]
It helps cost control, by showing the importance of fixed costs and variable costs. [1]
Other accepted point: it gives information in a concise, easy to understand format.
Break-even point (units) = fixed costs ÷ contribution per unit
Variable cost per unit = $25 + $35 = $60; contribution = $75 − $60 = $15
= $66 000 ÷ ($75 − $60) [1]
= 4400 units [1]
Break-even sales revenue = break-even units × selling price
= 4400 units × $75 = $330 000 [1]
Profit = (units sold − break-even units) × contribution per unit
= (5800 − 4400) × $15 = 1400 × $15
Units above break-even = 1400 [1]
Profit = $21 000 [1]
Write: the margin of safety is the difference between the maximum possible (or budgeted) sales or production and the break-even point. [1]
It can also be given as the sales that can be lost before a loss is made; one of these is enough.
New figures: price $75 + $7 = $82; materials 2 kg × 110% = 2.2 kg at $12.50 × 120% = $15 a kg; demand 5800 × 140% = 8120 units. Only 7500 units fit in normal working, so 620 units need overtime at a 25% premium.
Marginal cost statement for one month
| Details | Working | $ |
|---|---|---|
| Revenue | 8120 units (W1) × $82 | 665 840 [2] |
| Direct materials | 2.2 kg × $15 = $33; × 8120 units | (267 960) [2] |
| Direct labour, normal working | 7500 units × 3.5 hrs × $10 | 262 500 [1] |
| Direct labour, overtime | 620 units × 3.5 hrs × $12.50 | 27 125 [1] |
| Total direct labour | (289 625) [1] | |
| Total variable costs | (557 585) | |
| Contribution | 108 255 [1] |
| Details | Working | $ |
|---|---|---|
| Fixed costs | $66 000 + depreciation ($24 000 ÷ 5 ÷ 12 = $400) | (66 400) [1] |
| Profit per month | 41 855 [1] |
W1 New demand = 5800 × 140% = 8120 units. Overtime rate = $10 × 125% = $12.50 an hour; overtime units = 8120 − 7500 = 620.
Direct labour hours are limited (285 hours), so rank the products by contribution per labour hour.
| Details | Product A $ | Product B $ |
|---|---|---|
| Direct labour ($12 × 0.75; $12 × 0.5) | 9 | 6 [1] |
| Total variable cost (materials + labour) | 14 | 20 [1] |
| Contribution per unit (20 − 14; 25 − 20) | 6 | 5 [1] |
| Contribution per labour hour (6 ÷ 0.75; 5 ÷ 0.5) | 8 | 10 [1] |
Priority 1: Product B (higher contribution per labour hour): make all 200 units, using 200 × 0.5 = 100 hours. [1]
Priority 2: Product A: 285 − 100 = 185 hours left; 185 ÷ 0.75 = 246 units of A. [1]
Write four comments (some for, some against) and then a clear piece of advice.
For the plan: it ensures the factory makes the optimum (highest) profit, [1]
because Product B has the higher contribution per labour hour. [1]
Against the plan: the company risks losing regular customers for Product A, [1]
and so, in the longer term, profits may fall if those customers cannot be won back. [1]
Other accepted points: regular Product A customers may also cancel their Product B orders; suppliers of Product A materials may react badly to fewer orders; trade discounts for bulk orders may be lost.
Advice: state clearly whether the plan should be implemented, with a reason taken from your points above. [1]
▶ Whole paper
Video solution of the whole paper · by Karachians Academy. Tap the picture to open it on YouTube.
Solutions follow the official Cambridge mark schemes; marks are shown in grey. Videos are from other YouTube channels. Paper codes read component / series / year: M/J = May/June, O/N = October/November. Past-paper questions © UCLES, reproduced for classroom practice.