Q989706/11/M/J/20original Q28Multiple choice
Question 28 from 9706/11/M/J/20

Worked solution

The question asks what CVP analysis assumes makes costs change.

CVP assumes costs change only because the sales (activity) volume changes. Production methods and sales mix are assumed to stay the same.

So the answer is D.

A, B and C all include production methods or sales mix, which CVP assumes are constant.

KEY IDEACVP assumes costs change only with sales volume.
ANSWER D