9706/43/M/J/24 question 1: worked solution (May/June 2024, paper 43)
Show as plain textHide plain text
Cambridge A2 Level Accounting 9706 · 4.1 Activity based costing (ABC) Worked solution from the Cost and management accounting (A Level) Theory (Paper 4) booklet, Part 1 of 4. Q14 9706/43/M/J/24 original Q1 Structured · 25 marks Worked solution (a) Activity based costing: share each overhead by its cost driver , then divide by the 200 units of A. The mark-up is 50% of cost. Direct materials = $28 000 ÷ 200 units = $140 [1] Direct labour = 9 hours × $11 = $99 [1] Quality inspections = $12 000 × 180/500 ÷ 200 = $21.60 [1] Order processing = $18 000 × 240/360 ÷ 200 = $60 [1] Other overheads = $37 400 ÷ 680 units (200 + 480) = $55 [1] Cost = 140 + 99 + 21.60 + 60 + 55 = $375.60. Mark-up = 50% × $375.60 = $187.80. Selling price = $375.60 + $187.80 = $563.40 [1] (b) Option 1: work out the cost saving per unit, then the saving in mark-up. Saving in direct materials = $140 × 10% = $14 [1] Previous order processing cost = $60 per unit [1] New order processing cost = ($18 000 − $4 944) × 120/240 ÷ 200 = $32.64 , so the saving on order processing = 60 − 32.64 = $27.36 [1] Total cost saving = 14 + 27.36 = $41.36. Mark-up saved = 50% × $41.36 = $20.68 [1] Reduction in selling price = 41.36 + 20.68 = $62.04 [1] (c) Option 2: the workers cost less per hour but take 10% longer, and inspections cost more. New hours per unit = 9 × 110% = 9.9 hours. New rate = $11 − $2.30 = $8.70. New direct labour = 9.9 × $8.70 = $86.13. Saving = 99 − 86.13 = $12.87 [1] Previous inspection cost = $21.60 per unit [1] New inspection cost = ($12 000 + $3 080) × 260/580 ÷ 200 = $33.80 , so the extra cost = 33.80 − 21.60 = $12.20 [1] Cost saving = 12.87 − 12.20 = $0.67. Mark-up saved = 50% × $0.67 = $0.33 [1] Reduction in selling price = 0.67 + 0.33 = $1.00 [1] (d) Advise: give points on each option (up to 3 marks for each), then a decision with a comment. Option 1: the selling price drops a lot, which could stimulate demand and need more production; ask what competitors charge. [1] Buying larger quantities means more inventory and less chance of a stock-out, but needs extra storage and ties up more cash. [1] The discount increases profit, but the lower cost lowers the mark-up, so profit on Product A falls if volume is unchanged; Product B takes more order processing cost and its price rises slightly. [1] Option 2: the reduction in cost and selling price is small, so it is unlikely to make the product more attractive to customers. [1] Laying off existing workers could harm the company's reputation; there may be training costs and it may be hard to find enough replacement workers. [1] Quality could decline with less skilled workers (though longer time per unit may improve it), so ask what the plan is if inspections find many problem units. [1] Decision: write a clear decision (implement Option 1, Option 2 or neither) supported by a comment based on the points above. [1] (e) Write any two reasons: ABC gives more accurate and realistic cost information for setting prices. [1] It shows how overheads are incurred , so it identifies where costs can be saved or whether a product should be continued. [1] KEY IDEA ABC shares each overhead by its cost driver, so each product carries the cost it really causes. TOTAL 25 marks Official mark scheme VIDEO ▶ Topic lesson A lesson on this topic · by Edex World. Tap the picture to open it on YouTube.