Worked solution from the Cost and management accounting (A Level) Theory (Paper 3) booklet, Part 2 of 4.
Write: variance analysis is an investigation to explain the difference [1]
between a budgeted amount and an actual amount. [1]
Explain two benefits; each needs a point and its development (any two of these):
Benefit 1: it helps the business maintain control [1]
by setting targets and checking that they are achieved. [1]
Benefit 2: it helps the business address problems (adverse variances or under-performance) [1]
by taking remedial action. [1]
(Also accepted: it shows strengths, which can be reinforced; it lets the business review the standards to reduce differences from budget.)
Flexed budget: actual output of 7 500 units at standard costs.
Direct materials = 7 500 × 2 kilos × $10; direct labour = 7 500 × 3 hours × $15; fixed overhead = 7 500 × $18.
| Flexed budgeted production costs | $ |
|---|---|
| Direct materials | 150 000 |
| Direct labour | 337 500 [1] |
| Fixed overhead | 135 000 [1] |
| Production costs | 622 500 [1] |
Direct material variance = actual cost − flexed budget = $154 000 − $150 000 = $4 000 adverse [1]
Split the variance into price and usage (any four marks from these):
Material price variance = $154 000 − (14 200 × $10) = $154 000 − $142 000 = $12 000 adverse [1]
The price of materials has increased, causing the adverse variance. [1]
Material usage variance = (15 000 − 14 200) × $10 = $8 000 favourable (standard use is 7 500 × 2 = 15 000 kilos) [1]
Better quality materials may have been used, so fewer kilos were needed. [1]
Direct labour variance = $342 000 − $337 500 = $4 500 adverse [1]
Labour rate variance = $342 000 − (22 000 × $15) = $342 000 − $330 000 = $12 000 adverse [1]
The hourly rate of labour has increased. [1]
Labour efficiency variance = (22 500 − 22 000) × $15 = $7 500 favourable (standard hours are 7 500 × 3 = 22 500) [1]
Labour was more efficient, using fewer hours. [1]
Overhead absorption rate = $18 ÷ 3 hours = $6 per direct labour hour [1]
Fixed overhead volume variance = (budgeted units − actual units) × hours per unit × rate
This is adverse (A), because fewer units were made than budgeted. [1]
This is adverse, because fewer units were made than budgeted, so overhead was under-absorbed. [1]
For ABC (one point): a more realistic share of fixed overhead between products, giving better pricing for each product. [1]
Against ABC (one point): it is costly and time consuming to collect the information needed. [1]
Decision: write a clear decision, either to use ABC or to keep the existing basis, linked to the points above. [1]
▶ Whole paper
Video solution of the whole paper · by Karachians Academy. Tap the picture to open it on YouTube.
Solutions follow the official Cambridge mark schemes; marks are shown in grey. Videos are from other YouTube channels. Paper codes read component / series / year: M/J = May/June, O/N = October/November. Past-paper questions © UCLES, reproduced for classroom practice.