Worked solution from the Cost and management accounting (AS Level) MCQ booklet.
The question asks for the average cost per unit.
Materials = 1 100 units × $3 = $3 300.
Each operator can make 200 units a day, so 1 100 ÷ 200 = 5.5, which means 6 operators are needed. Labour = 6 × $400 = $2 400.
Set-up costs = $2 000.
Total cost = $3 300 + $2 400 + $2 000 = $7 700. Average cost = $7 700 ÷ 1 100 = $7.00.
So the answer is D.
A ($5.00) uses 5.5 operators and leaves out the set-up costs. B ($5.18) leaves out the set-up costs. C ($6.82) uses 5.5 operators ($2 200) instead of 6.