Worked solution from the Cost and management accounting (A Level) Theory (Paper 3) booklet, Part 2 of 4.
Overhead absorption rate = budgeted fixed overhead ÷ budgeted direct labour hours
= $96 000 ÷ (3 hours × 10 000 units)
= $3.20 per direct labour hour [1]
Standard cost of 9 000 units actually produced:
| Details | $ |
|---|---|
| Direct materials (2 × $8 × 9 000) | 144 000 |
| Direct labour (3 × $10 × 9 000) | 270 000 [1] |
| Fixed overhead ($3.20 × 3 × 9 000) | 86 400 [1] |
| Total standard cost | 500 400 [1] |
Workings: actual price per kilo = $148 500 ÷ 19 800 = $7.50. Actual hours = $283 500 ÷ $9 = 31 500. Standard kilos for 9 000 units = 18 000. Standard hours for 9 000 units = 27 000.
For each variance write the amount (1 mark) and put it in the favourable or adverse column (1 mark).
Reconciliation of standard cost with actual cost
| Details | Working | Favourable $ | Adverse $ |
|---|---|---|---|
| Total standard cost | – | 500 400 | |
| Materials price | 19 800 × ($8 − $7.50) | 9 900 | – [2] |
| Materials usage | $8 × (18 000 − 19 800) | – | 14 400 [2] |
| Labour rate | 31 500 × ($10 − $9) | 31 500 | – [2] |
| Labour efficiency | $10 × (27 000 − 31 500) | – | 45 000 [2] |
| Fixed overhead expenditure | $96 000 − $94 000 | 2 000 | – [2] |
| Fixed overhead volume | (10 000 − 9 000) × 3 × $3.20 | – | 9 600 [2] |
| Totals | 43 400 | 69 000 | |
| Net adverse variance (69 000 − 43 400) | 25 600 | ||
| Actual cost | 526 000 [1] |
For using the same standards (any two):
Using the same standards is simple and less time consuming than setting separate ones. [1]
It makes it easier to compare results and variances between the two factories. [1]
Against using the same standards (any two):
Labour rates, rent and rates are likely to be different in the two countries. [1]
The material cost is likely to be lower in France, as the cost of transporting the materials to Indonesia would not be included. [1]
Decision: for example, use separate standard costs for France, because labour, rent and material costs are likely to differ. (Any justified decision is credited.) [1]
A fixed budget is based on the budgeted output level, [1]
whereas a flexed budget is based on the actual output level. [1]
Write: a flexed budget lets the business compare like with like, so the variances are more meaningful. [1]
▶ Whole paper
Video solution of the whole paper · by IGCSE / AS LEVEL / A LEVEL MATHS AND ACCOUNTS. Tap the picture to open it on YouTube.
Solutions follow the official Cambridge mark schemes; marks are shown in grey. Videos are from other YouTube channels. Paper codes read component / series / year: M/J = May/June, O/N = October/November. Past-paper questions © UCLES, reproduced for classroom practice.