9609/31/O/N/20 question 2: worked solution (October/November 2020, paper 31)
Show as plain textHide plain text
Cambridge A2 Level Business 9609 · 9.3 Operations strategy Worked solution from the Operations management Theory (Paper 3) booklet, Part 3 of 3. Q20 9609/31/O/N/20 original Q2 Structured · 18 marks Worked solution (a)(i) Capacity utilisation (%) = rooms occupied ÷ total rooms × 100 Rooms occupied = 1300 + 1000 + 1600 = 3900; total rooms = 1600 + 1400 + 2000 = 5000 [1] = 3900 ÷ 5000 × 100 = 78% [1] (a)(ii) Variance = actual − budgeted (here, sales revenue per night from basic hotels). Budgeted revenue = 1800 rooms × $40 = $72 000 [1] Actual revenue = 1600 rooms × $40 = $64 000 [1] Variance = $64 000 − $72 000 = −$8 000 [1] This is adverse (actual revenue is below budget). [1] (b) Knowledge. Profit is revenue minus costs. Lean production means cutting waste while meeting customers' expectations, through inventory control (just in time), trained and flexible employees, flexible systems, total quality management (TQM) and Kaizen (continuous improvement). Application. NH's hotels are at 78% capacity utilisation, and basic hotels are $8 000 a night below budget. Each hotel holds enough sheets, towels, soaps and cosmetics for every room every day, and three days of food in the kitchens, whether needed or not. Employees are trained for only one role, tasks are set on worksheets with fixed times, and Head Office has not considered employees' letters of ideas, so the workforce is inflexible and not empowered. Analysis. Profit rises if costs fall or revenue rises. Lean production raises efficiency, so unit costs fall. Cutting inventory holdings of consumables and food (more JIT) lowers holding costs and waste. Training employees for several roles allows flexible working and links staff numbers to bookings, cutting costs. TQM and training could reduce complaints, which means fewer poor reviews and more bookings, so capacity utilisation and revenue rise. Valuing staff comments and empowering staff, for example with Kaizen, could bring improvements and more bookings. Moving to zero hour contracts would also lower costs by matching staff to demand. Evaluation. Lean production will probably improve profits, but not by itself. The changes cost money, and the costs might be bigger than the rise in profit. They also need a change in management approach and systems from NH's centralised, rigid Head Office control, and it is unclear that Jolin can make it. Lean production must be balanced against other factors such as marketing and the external economic and market conditions, which have been unfavourable. TQM has to be part of the lean system. Overall it should help profits in the medium term if it is introduced with empowerment and marketing. This earns the top level for knowledge: it defines profit and explains lean production with two or more relevant points. [2] It earns the top level for application: points are applied to NH (78%, inventory holdings, one-role training, Head Office control). [2] It reaches the top level for analysis: good use of theory shows how lean production cuts costs and lifts revenue and so profit. [4] It reaches the top level for evaluation: good judgement on cost, management change and other factors, with a conclusion. [4] KEY IDEA Lean production cuts waste and cost and can lift bookings, but it only raises profit if managers also change how they run the business. TOTAL 18 marks Official mark scheme VIDEO ▶ Topic lesson A lesson on this topic · by Saifullah Ajaz . Tap the picture to open it on YouTube.