9706/21/M/J/23 question 4: worked solution (May/June 2023, paper 21)
Show as plain textHide plain text
Cambridge AS Level Accounting 9706 · 2.2 Traditional costing methods Worked solution from the Cost and management accounting (AS Level) Theory (Paper 2) booklet, Part 2 of 2. Q29 9706/21/M/J/23 original Q4 Structured · 30 marks Worked solution (a) Apportion depreciation by machinery at carrying value and power by kilowatt hours , then reapportion the canteen (by employees ) and then maintenance (by machines in the production departments). Depreciation: $48 000 × 90 : 66 : 18 : 6 (total $180 000). Power: $40 200 × 1 800 : 1 500 : 100 : 200 (total 3 600 hours). Canteen $40 093 is shared 27 : 18 : 5 (50 employees); maintenance $55 196 is then shared 43 : 27 (70 machines). Details Cutting $ Assembly $ Maintenance $ Canteen $ Factory overheads 223 480 217 980 45 270 36 260 Depreciation of machinery 24 000 17 600 4 800 1 600 [1] Power 20 100 16 750 1 117 2 233 [1] Total overheads 267 580 252 330 51 187 40 093 Reapportionment (canteen) 21 650 14 434 4 009 (40 093) [1] Subtotal 289 230 266 764 55 196 – Reapportionment (maintenance) 33 906 21 290 (55 196) – [1] Total overheads 323 136 288 054 – – [1] The two service departments end at nil and both production totals add back to the full overheads. Later rows use the earlier figures (own figure). (b) Overhead absorption rate = total overheads ÷ activity. Cutting is machine-based, Assembly is labour-based. Cutting = $323 136 ÷ 40 000 machine hours = $8.08 per machine hour [1] Assembly = $288 054 ÷ 62 500 direct labour hours = $4.61 per labour hour [1] (c) Total cost of the order, then add profit. A profit margin of 25% of selling price means profit = 1/3 of cost. Item Working $ Direct materials 40 × $6.95 278.00 Direct labour: Cutting 40 × 3 × $10.90 1 308.00 [1] Direct labour: Assembly 40 × 4 × $8.20 1 312.00 Overheads: Cutting 40 × 8 × $8.08 2 585.60 [1] Overheads: Assembly 40 × 4 × $4.61 737.60 [1] Total costs 6 221.20 Profit = 1/3 × $6 221.20 = $2 073.73 [1] Selling price = $6 221.20 + $2 073.73 = $8 294.93 [1] (d) Write any two causes of under absorption: Actual overheads were higher than budgeted overheads. [1] Actual production (activity) was lower than planned. [1] (e) Labour hours used = 80% × 28 000 = 22 400 hours [1] Units made = 22 400 ÷ 2.5 hours = 8 960 units [1] Total contribution = 8 960 × $13 = $116 480 [1] Profit = $116 480 − $96 000 fixed costs = $20 480 [1] (f) Wye contribution = 10 000 × $8 = $80 000 [1] Wye uses 10 000 × 1.5 = 15 000 labour hours, so Exe gets (28 000 − 15 000) ÷ 2.5 = 5 200 units [1] Exe contribution = 5 200 × $13 = $67 600 [1] Total contribution = $80 000 + $67 600 = $147 600 Fixed costs = $96 000 + depreciation $7 200 (20% × $36 000) + loan interest $1 000 (5% × $20 000) = $104 200 [1] Total profit = $147 600 − $104 200 = $43 400 [1] (g) Advise: use points for and against, then give a decision with a comment. Up to 2 marks for the 'for' side and 4 for the 'against' side. For: the plan gives more (about double) the annual profit ($43 400 against $20 480). [1] For: all labour hours are used, so there is no risk of losing skilled labour while the factory is below full capacity. [1] Against: can a repeat order from the customer be guaranteed? [1] Against: customers may be lost if their regular orders cannot be completed because Exe output falls. [1] Against: if the customer does not repeat the order, fixed costs stay higher for several years , so profits fall in the long term. [1] Against: will there be retraining costs? and can the company get the loan? (write either one) [1] Decision: write that the plan should go ahead (or should not), supported by a comment such as the higher profit, weighed against the risk of a one-off order. [1] KEY IDEA Reapportion service costs step by step, absorb overheads at a rate per hour, and use contribution per limiting resource to judge a new product. TOTAL 30 marks Official mark scheme VIDEO ▶ Whole paper Video solution of the whole paper · by DebitSide. Tap the picture to open it on YouTube.