Worked solution from the Cost and management accounting (AS Level) MCQ booklet.
The question asks how many more units can be made before another supervisor is needed.
Each operator makes 36 ÷ 4 = 9 units a week.
Operators needed for 1140 units = 1140 ÷ 9 = 126.67, so 127 operators (you cannot employ part of a person).
Each supervisor covers up to 10 operators, so 127 operators need 13 supervisors.
13 supervisors can cover 130 operators, which can make 130 × 9 = 1170 units.
Extra units before a 14th supervisor is needed = 1170 − 1140 = 30.
So the answer is B.
A is the spare capacity of the operators only. C and D are too large.