Cambridge AS Level Accounting 9706 · 2.2 Traditional costing methods

Q43 · 9706/21/M/J/25 Q4

Worked solution from the Cost and management accounting (AS Level) Theory (Paper 2) booklet, Part 2 of 2.

Q439706/21/M/J/25original Q4Structured · 30 marks
Question 4 from 9706/21/M/J/25

Worked solution

(a)(i)

A cost centre is a department, service location or activity to which costs can be attributed. [1]

(a)(ii)

A fixed cost is a cost that stays unchanged within a certain level of activity or output. [1]

(a)(iii)

Indirect labour is the cost of employees whose work cannot be directly identified with the finished product. [1]

(b)

Rent is shared by floor area and depreciation by machinery cost. Stores is reapportioned by stores requisitions (48 : 74 : 18), then Maintenance by number of machines (7 : 3).

DetailsTotal $Processing $Assembly $Maintenance $Stores $
Overheads allocated570 760256 480193 98065 72054 580
Rent63 00029 40017 8506 9308 820 [1]
Depreciation45 00030 0009 0005 0001 000 [1]
Subtotal678 760315 880220 83077 65064 400
Reapportion Stores–22 08034 0408 280(64 400) [1]
Subtotal–337 960254 87085 930–
Reapportion Maintenance–60 15125 779(85 930)– [1]
Total overheads398 111280 649–– [1]

(c)

Rate = overheads ÷ hours. Processing is machine based, Assembly is labour based.

Processing = $398 111 ÷ 11 760 = $33.85 [1]

Unit: per machine hour [1]

Assembly = $280 649 ÷ 8 940 = $31.39 [1]

Unit: per labour hour [1]

(d)

Write two of these reasons:

Actual expenditure was more than budgeted expenditure. [1]

Production was less than planned (so fewer hours were used to absorb the overheads). [1]

(e)

Labour cost per unit = pay rate per hour ÷ units made per hour

Normal labour: $9.60 ÷ 24 units = $0.40 per unit [1]

Experienced labour: $10.50 ÷ 30 units = $0.35 per unit [1]

Amount saved = $0.40 − $0.35 = $0.05 per unit [1]

(f)

Profit margin of 60% means profit is 60% of the selling price, so cost is 40% and profit = 1.5 × cost. Overheads use the rates from (c) (machine hours for Processing, labour hours for Assembly).

Statement of the selling price for 300 units

Details$
Direct materials (300 × 1.8 × $4.80)2 592.00 [1]
Direct labour: Processing (300 × $9.60 × 2.25)6 480.00 [1]
Direct labour: Assembly (300 × $12.20 × 1.75)6 405.00 [1]
Overheads: Processing (300 × 1.80 × $33.85)18 279.00 [1]
Overheads: Assembly (300 × 1.75 × $31.39)16 479.75 [1]
Total cost50 235.75 [1]
Profit (1.5 × $50 235.75)75 353.63 [1]
Selling price125 589.38 [1]

(g)

Advise means: points for and against, then a decision with a comment.

For marginal costing: prices can be set more flexibly, so the business can be more competitive. [1]

It avoids problems of absorption costing, such as the arbitrary apportionment of overheads. [1]

Against: there is a risk that fixed costs may not be covered. [1]

It may be difficult to find the marginal cost where some costs have both fixed and variable parts. [1]

Decision: Ameerah should use marginal costing, because it lets her set more competitive prices and keep customers, as long as the prices still cover the fixed costs. [1]

KEY IDEAAbsorption costing shares overheads using rates per hour; marginal costing ignores fixed costs in pricing so prices can be more flexible.
TOTAL 30 marks

Official mark scheme

Mark scheme for 9706/21/M/J/25 question 4
VIDEO
▶ Starts at Q4 (1:47:41)

Starts at Q4 (1:47:41) · by Sir Waleed Khanzada. Tap the picture to open it on YouTube.

Solutions follow the official Cambridge mark schemes; marks are shown in grey. Videos are from other YouTube channels. Paper codes read component / series / year: M/J = May/June, O/N = October/November. Past-paper questions © UCLES, reproduced for classroom practice.