Cambridge O Level Business Studies 7115 · 5.1 Business finance: needs and sources

Q2 · 7115/22/O/N/20 Q1

Worked solution from the Financial information and decisions Theory (Paper 2) booklet, Part 1 of 5.

Q27115/22/O/N/20original Q1Structured · 20 marks
Question 1 from 7115/22/O/N/20

Worked solution

(a)

Explain means: give the reason, then say why it matters to CC. Write two reasons, each with a short explanation that mentions CC.

Reason 1: to provide working capital / pay day-to-day expenses (knowledge). [1]

CC had to pay some expenses before it had regular cash inflows (application), [1]

for example wages for its 10 production workers and the cost of raw materials (explanation), [1]

because if CC cannot pay its costs it cannot produce its phone covers, and it would have cash flow problems (analysis). [1]

Reason 2: to buy investment goods / capital (non-current assets) (knowledge). [1]

CC leased a factory and bought equipment to make its phone covers (application), [1]

which needs a large amount of money, so the $10 000 saved by each partner may not be enough on its own (explanation), [1]

so CC also needed a bank loan of $10 000 and a government grant (analysis). [1]

(b)

Write about both methods (benefits and limitations), then recommend one and say why the other was rejected.

Quality control: products are checked at the end of the production line, so faults are found before the customer gets the phone cover. Less training is needed for the 10 workers because inspectors check the covers. But inspectors must be employed, which raises costs. It finds faulty covers but not where the fault happened, so the faulty process carries on, and faulty covers that are scrapped are expensive.

Quality assurance: products are checked at every stage of production, so there are fewer faults at the end and fewer customer complaints about faulty covers. Fewer covers are scrapped, so costs are lower. Workers may feel trusted and more motivated. But it can be expensive to train the 10 workers to check their own work, it depends on workers being reliable and committed, and it takes longer because each worker checks their own work.

Recommendation: quality assurance is best for CC. Each stage is checked, so a faulty cover is less likely to reach customers, which protects the brand image of CC's products. Fewer faulty covers are scrapped, and CC saves the cost of employing inspectors that quality control would need.

Why quality control was rejected: it would only suit CC if making a cover is a simple process, because then inspectors can do a quick check at the end and the 10 workers need no extra training. But it finds faults too late and the cost of scrapping covers is high.

This reaches Level 3 because it discusses both methods in detail, with benefits and limitations applied to CC's covers and workers, gives a well-justified recommendation and says why the other method was rejected. [12]

KEY IDEAFinance is needed to start up and buy equipment, and to pay day-to-day costs; checking quality at every stage (quality assurance) cuts faults and scrap.
TOTAL 20 marks

Official mark scheme

Mark scheme for 7115/22/O/N/20 question 1
VIDEO
▶ Whole paper

Video solution of the whole paper · by Economics by Abdul Hadi. Tap the picture to open it on YouTube.

Solutions follow the official Cambridge mark schemes; marks are shown in grey. Videos are from other YouTube channels. Paper codes read component / series / year: M/J = May/June, O/N = October/November. Past-paper questions © UCLES, reproduced for classroom practice.