Cambridge A2 Level Economics 9708 · 7.5 Types of cost, revenue and profit, short-run and long-run production

Q209 · 9708/31/M/J/23 Q7

Worked solution from the The price system and the microeconomy MCQ booklet.

Q2099708/31/M/J/23original Q7Multiple choice
Question 7 from 9708/31/M/J/23

Worked solution

The question asks what follows if short-run MC is below average variable cost (AVC).

If MC is below the average, the next unit pulls the average down.

So AVC is falling.

So the answer is B.

A would need MC = AVC. D would need MC above AVC. C is wrong because ATC = AVC + AFC, so AVC is always below ATC.

KEY IDEAWhen MC is below AVC, AVC is falling.
ANSWER B
VIDEO
▶ Whole paper

Video solution of the whole paper · by Daniyal Aslam. Tap the picture to open it on YouTube.

Solutions follow the official Cambridge mark schemes. Videos are from other YouTube channels. Paper codes read component / series / year: M/J = May/June, O/N = October/November. Past-paper questions © UCLES, reproduced for classroom practice.