9609/32/M/J/22 question 1: worked solution (May/June 2022, paper 32)
Show as plain textHide plain text
Cambridge A2 Level Business 9609 · 9.3 Operations strategy Worked solution from the Operations management Theory (Paper 3) booklet, Part 3 of 3. Q30 9609/32/M/J/22 original Q1 Structured · 10 marks Worked solution Analyse means: explain each benefit step by step. Write about benefits only (no drawbacks). Knowledge: Kaizen is continuous improvement based on worker group discussion. It uses Kaizen groups (like quality circles), each with the power to take decisions, and makes small (incremental) changes to improve quality or efficiency. Benefit 1: higher productivity and fewer rejected products. Application: at the Hydrocamel factory productivity is not rising and 5% of output is rejected, and Amandi's focus is on minimising costs. Analysis: workers know the work, so their ideas solve the factory's problems → productivity rises and fewer products are faulty → unit costs fall and customers are satisfied → higher sales and profit. Benefit 2: motivation, less absenteeism and lower labour turnover. Application: absenteeism is increasing at the factory, and absence raises costs. Analysis: more responsibility at work (Herzberg) motivates employees → absenteeism and labour turnover fall → more output, less disruption to production, less pressure on other employees and lower recruitment costs → profit rises. This earns the top level for knowledge: good knowledge of Kaizen and its benefits. [3] It earns the top level for application: two points applied to WTZ (the rejected output, rising absenteeism and the cost focus). [2] It reaches the top level for analysis: good use of theory and reasoned argument explaining each benefit. [5] KEY IDEA Kaizen involves workers in small, continuous improvements, which raises productivity and quality and cuts absenteeism. TOTAL 10 marks Official mark scheme VIDEO ▶ Whole paper Video solution of the whole paper · by Karachians Academy. Tap the picture to open it on YouTube.