Cambridge AS Level Mathematics 9709 · 18.2 Normal approximation to the binomial distribution

Q61 · 9709/53/M/J/24 Q5

Worked solution from the The normal distribution Paper 5 Probability & Statistics 1 booklet, Part 2 of 2.

Q619709/53/M/J/24original Q5Structured · 11 marks
Question 5 from 9709/53/M/J/24

Worked solution

(a)

First completion on day 5 means four failures, then a success.

P = 0.354 × 0.65 = 0.00975 [1]

(b)

Second completion on day 5 means exactly one completion in the first 4 days (in any of 4 positions), then a completion on day 5.

P = 0.353 × 0.652 × 4 [1]

= 0.0725 [1]

(c)

Let X ~ B(7, 0.65). Fewer than 5 means 1 − P(5, 6, 7).

P(X < 5) = 1 − (7C5 × 0.655 × 0.352 + 7C6 × 0.656 × 0.35 + 0.657) [2]

= 1 − (0.29848 + 0.18478 + 0.049022) = 0.468 [1]

(d)

Over 84 days, X ~ B(84, 0.65). n is large, so use a normal approximation.

Mean = 84 × 0.65 = 54.6 and variance = 84 × 0.65 × 0.35 = 19.11 [1]

P(X > 50) = P(X ≥ 51), so use 50.5 as the continuity correction. Use N(54.6, 19.11).

z = 50.5 − 54.6√19.11 = −0.9379 (standardising with the mean and standard deviation) [1]

Using 50.5 as the continuity correction [1]

P(Z > −0.9379) = Φ(0.9379) [1]

= 0.826 [1]

KEY IDEA'First time on day n' needs n − 1 failures then a success. 'Second time on day n' needs one success in the earlier days, in any position, then a success. Large n suggests a normal approximation with a continuity correction.
TOTAL 11 marks

Official mark scheme

Mark scheme for 9709/53/M/J/24 question 5
VIDEO
▶ Starts at Q5 (44:11)

Starts at Q5 (44:11) · by Ci Xiang Ng. Tap the picture to open it on YouTube.

Solutions follow the official Cambridge mark schemes; marks are shown in grey. Videos are from other YouTube channels. Paper codes read component / series / year: M/J = May/June, O/N = October/November. Past-paper questions © UCLES, reproduced for classroom practice.