Worked solution from the The normal distribution Paper 5 Probability & Statistics 1 booklet, Part 2 of 2.
First completion on day 5 means four failures, then a success.
P = 0.354 × 0.65 = 0.00975 [1]
Second completion on day 5 means exactly one completion in the first 4 days (in any of 4 positions), then a completion on day 5.
P = 0.353 × 0.652 × 4 [1]
= 0.0725 [1]
Let X ~ B(7, 0.65). Fewer than 5 means 1 − P(5, 6, 7).
P(X < 5) = 1 − (7C5 × 0.655 × 0.352 + 7C6 × 0.656 × 0.35 + 0.657) [2]
= 1 − (0.29848 + 0.18478 + 0.049022) = 0.468 [1]
Over 84 days, X ~ B(84, 0.65). n is large, so use a normal approximation.
Mean = 84 × 0.65 = 54.6 and variance = 84 × 0.65 × 0.35 = 19.11 [1]
P(X > 50) = P(X ≥ 51), so use 50.5 as the continuity correction. Use N(54.6, 19.11).
z = 50.5 − 54.6√19.11 = −0.9379 (standardising with the mean and standard deviation) [1]
Using 50.5 as the continuity correction [1]
P(Z > −0.9379) = Φ(0.9379) [1]
= 0.826 [1]
▶ Starts at Q5 (44:11)
Starts at Q5 (44:11) · by Ci Xiang Ng. Tap the picture to open it on YouTube.
Solutions follow the official Cambridge mark schemes; marks are shown in grey. Videos are from other YouTube channels. Paper codes read component / series / year: M/J = May/June, O/N = October/November. Past-paper questions © UCLES, reproduced for classroom practice.