Cambridge O Level Pakistan Studies 2059 · 21.2 Secondary and tertiary industries

Q2 · 2059/21/O/N/20 Q3

Worked solution from the Industrial development Theory (Paper 2) booklet, Part 1 of 1.

Q22059/21/O/N/20original Q3Structured · 25 marks
Question 3 from 2059/21/O/N/20

Worked solution

(a)(i)

Write pipe on the left label (the pipe going down into the ground) and derrick on the label pointing to the tall tower [1]

Write refinery on the top right label, beside the buildings and pipes [1]

(a)(ii)

Plot a cross at 410 (thousand barrels per day) above 2012 on the graph [1]

Join it with straight lines to the 2011 point and the 2013 point to complete the line [1]

(a)(iii)

Circle 91 000 [1]

(a)(iv)

Write any two: by pipeline [1]

by road (tanker/truck) [1]

(b)(i)

Refined means that impurities and unwanted substances are removed from the oil by processing [1]

(b)(ii)

Write any three features seen in the photograph: tall towers/chimneys [1]

raised pipelines [1]

a large area of flat land [1]

(b)(iii)

Refinery 1: Attock Refinery [1]

at Morgah, Rawalpindi [1]

Refinery 2: PARCO (Pak-Arab) refinery [1]

at Mehmood Kot near Multan/Muzaffargarh [1]

(c)

Oil is burnt as fuel [1]

and this heats water [1]

The heat boils the water into steam [1]

and the steam turns a turbine, which drives the generator to produce electricity [1]

(d)

For developing new reserves: Pakistan has an energy crisis, so any new reserve helps. Jhandial is a large find, bigger than earlier ones, so it is worth investing in. Both gas and oil are there. Pakistan would save money and foreign exchange on imported oil.

Against: it is expensive to extract, and foreign investors such as China may be needed, so Pakistan stays dependent on others. It needs better infrastructure and trained workers. Oil and gas are finite fossil fuels, and extracting and moving them causes environmental damage.

Judgement: Pakistan should develop the new reserves because they ease the energy crisis and save foreign exchange, but only as a short-term help, as Jhandial will not last and Pakistan should also invest in alternative energy.

This reaches Level 3: developed points on both views, an evaluation and the Jhandial example. [6]

KEY IDEANew oil and gas help the energy crisis and save imports, but they are costly, finite and harm the environment, so alternative energy is also needed.
TOTAL 25 marks

Official mark scheme

Mark scheme for 2059/21/O/N/20 question 3
VIDEO
▶ Topic lesson

A lesson on this topic · by Muhammad Yousuf Memon. Tap the picture to open it on YouTube.

Solutions follow the official Cambridge mark schemes; marks are shown in grey. Videos are from other YouTube channels. Paper codes read component / series / year: M/J = May/June, O/N = October/November. Past-paper questions © UCLES, reproduced for classroom practice.