Worked solution from the Cost and management accounting (A Level) Theory (Paper 4) booklet, Part 2 of 4.
The flexible budget changes the fixed budget to the actual activity of 2 180 units. Each fixed-budget figure is divided by 2 000 units and multiplied by 2 180 units.
| Details | $ |
|---|---|
| Sales revenue ($184 000 ÷ 2 000 × 2 180) | 200 560 |
| Direct materials ($84 000 ÷ 2 000 × 2 180) | 91 560 |
| Direct labour ($60 000 ÷ 2 000 × 2 180) | 65 400 [1] |
| Fixed overhead ($18 000 ÷ 2 000 × 2 180) | 19 620 [1] |
| Total cost | 176 580 |
| Budgeted profit | 23 980 [1] |
Budgeted profit = $200 560 − $176 580 = $23 980.
Sales price variance = (actual units × budgeted price) − actual revenue
Budgeted price = $184 000 ÷ 2 000 = $92
= (2 180 × $92) − $196 200 = $200 560 − $196 200 = $4 360 [1]
The actual revenue is less than expected, so it is adverse. [1]
Sales volume variance = (actual units − budgeted units) × budgeted profit per unit
Budgeted profit per unit = $22 000 ÷ 2 000 = $11
= (2 180 − 2 000) × $11 = $1 980 [1]
More units were sold than budgeted, so it is favourable. [1]
Fixed overhead expenditure variance = actual fixed overhead − budgeted fixed overhead
= $18 400 − $18 000 = $400 [1]
Actual overhead is higher than budgeted, so it is adverse. [1]
Fixed overhead volume variance = absorbed (flexible budget) fixed overhead − budgeted fixed overhead
= $19 620 (own figure from (a)) − $18 000 = $1 620 [1]
More was absorbed than budgeted, so it is favourable. [1]
Start with the flexible budgeted profit and add or subtract each variance (adverse in brackets, favourable added) to reach the actual profit.
| Details | $ |
|---|---|
| Flexible budgeted profit | 23 980 [1] |
| Sales price variance | (4 360) A [1] |
| Direct materials variance ($113 796 − $91 560) | (22 236) A [1] |
| Direct labour variance ($65 400 − $55 590) | 9 810 F [2] |
| Fixed overhead expenditure | (400) A |
| Fixed overhead volume | 1 620 F [1] |
| Actual profit | 8 414 [1] |
Check: 23 980 − 4 360 − 22 236 + 9 810 − 400 + 1 620 = 8 414.
Advise means: give the calculations and the points for each supplier, then a decision with a comment.
Calculations:
Material cost per unit: supplier A = 2.8 kilos × $13.75 = $38.50; supplier B = 2.5 kilos × $15.40 = $38.50. The unit cost is the same for both. [1]
The $38.50 is lower than both the budgeted cost of $42 ($84 000 ÷ 2 000) and the actual cost of $52.20 ($113 796 ÷ 2 180). [1]
Comments:
Supplier B's materials are of better quality than A's. [1]
This is because there is less wastage. [1]
Poor quality material from A may reduce the efficiency of workers and the quality of the final product. [1]
Supplier B may bring extra costs such as import duty, freight and insurance. [1]
Decision: choose supplier B, because the unit cost is the same as A's but the quality is better with less wastage. [1]
Other valid points are also accepted, for example the unit price of A is lower, or delivery from B takes longer for an urgent order.
▶ Whole paper
Video solution of the whole paper · by IGCSE / AS LEVEL / A LEVEL MATHS AND ACCOUNTS. Tap the picture to open it on YouTube.
Solutions follow the official Cambridge mark schemes; marks are shown in grey. Videos are from other YouTube channels. Paper codes read component / series / year: M/J = May/June, O/N = October/November. Past-paper questions © UCLES, reproduced for classroom practice.