Worked solution from the Cost and management accounting (AS Level) MCQ booklet.
The question asks why overheads would be over absorbed. Overheads are over absorbed when the overheads absorbed into production are more than the overheads actually incurred.
This is the same as saying overheads incurred are less than the overheads absorbed.
So the answer is C.
A and B compare absorbed overheads with budgeted overheads, which is not the test. D describes under-absorption.
▶ Starts at Q25 (39:05)
Starts at Q25 (39:05) · by Study with Prashna. Tap the picture to open it on YouTube.
Solutions follow the official Cambridge mark schemes. Videos are from other YouTube channels. Paper codes read component / series / year: M/J = May/June, O/N = October/November. Past-paper questions © UCLES, reproduced for classroom practice.