Worked solution from the Cost and management accounting (AS Level) Theory (Paper 2) booklet, Part 2 of 2.
Apportion each overhead on a fair basis: indirect wages by number of indirect employees (20 in total, so $420 000 ÷ 20 = $21 000 each); factory rent and rates by floor space (12 000 m², so $30 000 ÷ 12 000 = $2.50 a m²); machine overheads by machine hours (34 300 + 25 700 = 60 000 hours, as the question says).
Then share the Stores total over the departments that use it, by number of orders (2 100 + 1 600 + 500 = 4 200), and the Maintenance total over the production departments by call outs (210 + 40 = 250).
| Details | Total $ | Machining $ | Assembly $ | Stores $ | Maintenance $ |
|---|---|---|---|---|---|
| Indirect wages | 420 000 | 84 000 | 252 000 | 42 000 | 42 000 [1] |
| Factory rent and rates | 30 000 | 10 000 | 14 000 | 4 500 | 1 500 [1] |
| Machine overheads | 22 000 | 12 577 | 9 423 | – | – [1] |
| Total overheads | 472 000 | 106 577 | 275 423 | 46 500 | 43 500 |
| Apportion Stores | – | 23 250 | 17 714 | (46 500) | 5 536 [1] |
| Subtotal | 472 000 | 129 827 | 293 137 | – | 49 036 |
| Apportion Maintenance | – | 41 190 | 7 846 | – | (49 036) [1] |
| Total overhead costs | 472 000 | 171 017 | 300 983 | – | – [1] |
The two service departments are cleared to nil, so the whole $472 000 now sits in the two production departments (own figures count if the Stores share is worked from your own totals).
Overhead absorption rate = total overheads of the department ÷ budgeted activity (the hours that best match how the work is done).
Machining is machine based, so use machine hours: $171 017 ÷ 34 300 hours = $4.99 per machine hour (rate, and machine hours as the basis) [2]
Assembly is labour based, so use direct labour hours: $300 983 ÷ 77 700 hours = $3.87 per direct labour hour (rate, and labour hours as the basis) [2]
Overhead absorbed = actual hours × absorption rate. Compare it with the actual overheads.
| Details | Machining $ | Assembly $ |
|---|---|---|
| Actual overheads | 226 952 | 267 465 |
| Absorbed: 44 120 × $4.99 | 220 159 | |
| Absorbed: 72 580 × $3.87 | 280 885 |
Machining: $226 952 − $220 159 = $6 793 under-absorbed (too little overhead was charged to the work) [2]
Assembly: $280 885 − $267 465 = $13 420 over-absorbed (too much overhead was charged to the work) [2]
For the special order, change each cost as the question says. Assembly labour is paid at the usual $12 plus 25% overtime premium = $15 an hour.
| Details | Working | $ |
|---|---|---|
| Direct materials | $45.60 × 1.3 | 59.28 [1] |
| Direct labour: Machining | 30 min × 1.5 = 45 min; 0.75 h × $10 | 7.50 [1] |
| Direct labour: Assembly | 105 + 15 = 120 min; 2 h × $15 | 30.00 [1] |
| Total direct cost of one bicycle | 96.78 [1] |
Total cost = direct cost + overheads absorbed. A 30% gross profit margin means profit is 30% of the selling price, so profit = total cost × 30/70.
| Details | Working | $ |
|---|---|---|
| Direct cost | $96.78 × 120 | 11 613.60 [1] |
| Machining overheads | $4.99 × 20 min (1/3 h) × 120 | 199.60 [1] |
| Assembly overheads | $3.87 × 120 min (2 h) × 120 | 928.80 [1] |
| Total cost | 12 742.00 | |
| Gross profit | $12 742.00 × 30/70 | 5 460.86 [1] |
| Quoted selling price | 18 202.86 [1] |
Working per bicycle (unit basis) is also accepted: $96.78 + $1.66 + $7.74 = $106.18 a unit, × 120 = $12 741.60, which gives a price of about $18 202.
Give points for and against, then your decision. Write any six comments in all.
Reasons to accept
The new customer may become a major customer over time. [1]
The terms offered will still produce a profit for the business. [1]
Reasons to reject
Two months' credit may make the business's cash flow difficulties worse. [1]
Existing customers may try to negotiate better credit terms too. [1]
Andreas cannot be sure the regular orders will continue. [1]
The 10% discount means the work will not give the 30% gross profit margin he wants. [1]
Advice: Andreas should reject the terms (cash flow is already hard to manage and the margin falls below 30%), supported by the comments above. [1]
Another valid decision with valid comments (for example, accept only after checking the customer's creditworthiness) also earns the advice mark.
▶ Starts at Q4 (1:37:49)
Starts at Q4 (1:37:49) · by Sir Waleed Khanzada. Tap the picture to open it on YouTube.
Solutions follow the official Cambridge mark schemes; marks are shown in grey. Videos are from other YouTube channels. Paper codes read component / series / year: M/J = May/June, O/N = October/November. Past-paper questions © UCLES, reproduced for classroom practice.