Cambridge AS Level Accounting 9706 · 2.2 Traditional costing methods

Q33 · 9706/22/O/N/23 Q4

Worked solution from the Cost and management accounting (AS Level) Theory (Paper 2) booklet, Part 2 of 2.

Q339706/22/O/N/23original Q4Structured · 30 marks
Question 4 from 9706/22/O/N/23

Worked solution

(a)

Apportion each overhead on a fair basis: indirect wages by number of indirect employees (20 in total, so $420 000 ÷ 20 = $21 000 each); factory rent and rates by floor space (12 000 m², so $30 000 ÷ 12 000 = $2.50 a m²); machine overheads by machine hours (34 300 + 25 700 = 60 000 hours, as the question says).

Then share the Stores total over the departments that use it, by number of orders (2 100 + 1 600 + 500 = 4 200), and the Maintenance total over the production departments by call outs (210 + 40 = 250).

DetailsTotal $Machining $Assembly $Stores $Maintenance $
Indirect wages420 00084 000252 00042 00042 000 [1]
Factory rent and rates30 00010 00014 0004 5001 500 [1]
Machine overheads22 00012 5779 423–– [1]
Total overheads472 000106 577275 42346 50043 500
Apportion Stores–23 25017 714(46 500)5 536 [1]
Subtotal472 000129 827293 137–49 036
Apportion Maintenance–41 1907 846–(49 036) [1]
Total overhead costs472 000171 017300 983–– [1]

The two service departments are cleared to nil, so the whole $472 000 now sits in the two production departments (own figures count if the Stores share is worked from your own totals).

(b)

Overhead absorption rate = total overheads of the department ÷ budgeted activity (the hours that best match how the work is done).

Machining is machine based, so use machine hours: $171 017 ÷ 34 300 hours = $4.99 per machine hour (rate, and machine hours as the basis) [2]

Assembly is labour based, so use direct labour hours: $300 983 ÷ 77 700 hours = $3.87 per direct labour hour (rate, and labour hours as the basis) [2]

(c)

Overhead absorbed = actual hours × absorption rate. Compare it with the actual overheads.

DetailsMachining $Assembly $
Actual overheads226 952267 465
Absorbed: 44 120 × $4.99220 159
Absorbed: 72 580 × $3.87280 885

Machining: $226 952 − $220 159 = $6 793 under-absorbed (too little overhead was charged to the work) [2]

Assembly: $280 885 − $267 465 = $13 420 over-absorbed (too much overhead was charged to the work) [2]

(d)

For the special order, change each cost as the question says. Assembly labour is paid at the usual $12 plus 25% overtime premium = $15 an hour.

DetailsWorking$
Direct materials$45.60 × 1.359.28 [1]
Direct labour: Machining30 min × 1.5 = 45 min; 0.75 h × $107.50 [1]
Direct labour: Assembly105 + 15 = 120 min; 2 h × $1530.00 [1]
Total direct cost of one bicycle96.78 [1]

(e)

Total cost = direct cost + overheads absorbed. A 30% gross profit margin means profit is 30% of the selling price, so profit = total cost × 30/70.

DetailsWorking$
Direct cost$96.78 × 12011 613.60 [1]
Machining overheads$4.99 × 20 min (1/3 h) × 120199.60 [1]
Assembly overheads$3.87 × 120 min (2 h) × 120928.80 [1]
Total cost12 742.00
Gross profit$12 742.00 × 30/705 460.86 [1]
Quoted selling price18 202.86 [1]

Working per bicycle (unit basis) is also accepted: $96.78 + $1.66 + $7.74 = $106.18 a unit, × 120 = $12 741.60, which gives a price of about $18 202.

(f)

Give points for and against, then your decision. Write any six comments in all.

Reasons to accept

The new customer may become a major customer over time. [1]

The terms offered will still produce a profit for the business. [1]

Reasons to reject

Two months' credit may make the business's cash flow difficulties worse. [1]

Existing customers may try to negotiate better credit terms too. [1]

Andreas cannot be sure the regular orders will continue. [1]

The 10% discount means the work will not give the 30% gross profit margin he wants. [1]

Advice: Andreas should reject the terms (cash flow is already hard to manage and the margin falls below 30%), supported by the comments above. [1]

Another valid decision with valid comments (for example, accept only after checking the customer's creditworthiness) also earns the advice mark.

KEY IDEAShare service-department overheads fairly, absorb them using hours that match the work, and price an order from its total cost with the profit margin worked on the selling price.
TOTAL 30 marks

Official mark scheme

Mark scheme for 9706/22/O/N/23 question 4
VIDEO
▶ Starts at Q4 (1:37:49)

Starts at Q4 (1:37:49) · by Sir Waleed Khanzada. Tap the picture to open it on YouTube.

Solutions follow the official Cambridge mark schemes; marks are shown in grey. Videos are from other YouTube channels. Paper codes read component / series / year: M/J = May/June, O/N = October/November. Past-paper questions © UCLES, reproduced for classroom practice.