9706/11/M/J/22 question 23: worked solution (May/June 2022, paper 11)
Show as plain textHide plain text
Cambridge AS Level Accounting 9706 · 2.1 Costs and cost behaviour Worked solution from the Cost and management accounting (AS Level) MCQ booklet. Q40 9706/11/M/J/22 original Q23 Multiple choice Worked solution The question asks for the week's wages: basic pay, time-saved bonus, less a deduction for rejected units. Basic pay = 35 × $24 = $840 Target: 15 minutes per unit, so 4 units an hour. In 35 hours the target is 35 × 4 = 140 units. Units made = 170, so she made 30 more than the target. Time saved = 30 × 15 minutes = 450 minutes = 7.5 hours . Bonus rate = 25% × $24 = $6 per hour, so bonus = 7.5 × $6 = $45 Deduction = 2 rejected units × $2.50 = $5 Wages = $840 + $45 − $5 = $880 So the answer is B . A is basic pay only. C forgets to take off the $5 for rejects. D adds a bonus that is too big. KEY IDEA Time-saved bonus = hours saved × bonus rate; deductions for rejected units are taken off the total. ANSWER B VIDEO ▶ Starts at Q23 (45:13) Starts at Q23 (45:13) · by Study with Prashna. Tap the picture to open it on YouTube.