9706/22/F/M/25 question 4: worked solution (February/March 2025, paper 22)

Show as plain text

Cambridge AS Level Accounting 9706 · 2.2 Traditional costing methods Worked solution from the Cost and management accounting (AS Level) Theory (Paper 2) booklet, Part 2 of 2. Q42 9706/22/F/M/25 original Q4 Structured · 30 marks Worked solution (a) Share each overhead by the basis given: supervisors' salaries go straight to their department; depreciation by cost of machinery ; rent by floor area . Reapportion the Canteen by number of employees (45 : 31 : 6) and the Stores by issues from stores (84 : 43). Details Total $ Cutting $ Finishing $ Stores $ Canteen $ Overheads allocated 424 560 183 270 145 990 45 380 49 920 Supervisors' salaries 54 500 28 200 26 300 – – Depreciation of machinery 87 000 44 000 30 400 7 400 5 200 [1] Rent 48 000 24 000 14 240 4 480 5 280 [1] Subtotal 614 060 279 470 216 930 57 260 60 400 Reapportion Canteen – 33 146 22 834 4 420 (60 400) [1] Subtotal – 312 616 239 764 61 680 – Reapportion Stores – 40 796 20 884 (61 680) – [1] Total overheads 353 412 260 648 – – [1] (b) Rate = overheads ÷ hours. Cutting is machine based, so use machine hours; Finishing is labour based, so use labour hours. Cutting = $353 412 ÷ 8 220 = $42.99 [1] Unit: per machine hour [1] Finishing = $260 648 ÷ 7 144 = $36.48 [1] Unit: per labour hour [1] (c) AVCO: after each receipt, the average cost is total value ÷ total units, and issues are valued at that average. Workings: 6 Jan: 6 units at $8 + 12 at $8 = 18 units, $144. 9 Jan: issue 7 at $8 = $56, so 11 units remain, $88. 16 Jan: add 8 × $9 = $72, so 19 units, $160 (average about $8.42). 21 Jan: issue 13, leaving 6 units. 27 Jan: add 10 × $10 = $100. Date Inventory valuation $ 1 Jan 48 6 Jan 144 [1] 9 Jan 88 [1] 16 Jan 160 [1] 21 Jan 50.52 [1] 27 Jan 150.52 [1] (d)(i) Option A: only 70% of the materials are available. Use them first on the product with the highest contribution per kg . Contribution per kg: Bee $19 ÷ 7 kg = $2.71; Cee $21 ÷ 9 kg = $2.33, so make Bee first. [1] Forecast materials = (60 × 7) + (50 × 9) = 420 + 450 = 870 kg [1] Materials available = 870 × 70% = 609 kg [1] Product Materials used kg Materials left kg Contribution $ Bee (60 × $19) 420 189 1 140 [1] Cee (21 × $21) 189 – 441 [1] Total contribution 1 581 Less fixed costs (1 100) Profit for the month 481 [1] (d)(ii) Option B: buy the shortfall of Cee materials at $5 a kg, so the extra material cost is $1 a kg more than $4. Remaining units of Cee = 50 − 21 = 29 units [1] New contribution per Cee = $21 − $9 = $12 (9 kg × $1 extra) [1] Profit = $481 + (29 × $12) = $829 [1] (e) Write points for each option, then a decision. Option A: reduced production means less sales and profit ; [1] but there are no worries over supplier reliability or quality , and no new supplier is needed. [1] Option B: gives the higher profit ($829 against $481). [1] It meets demand and keeps production at the forecast level, so no sales are lost to competitors. [1] But will the new overseas supplier be reliable and deliver on time, and will the materials be of the usual quality? [1] Materials cost more ($5 a kg) and there may be import taxes or higher delivery costs. [1] Decision: choose Option B , because it gives the higher profit and keeps customers, provided the new supplier proves reliable. [1] KEY IDEA When materials are short, use them on the product with the highest contribution per kg, and compare that with the extra cost of buying more. TOTAL 30 marks Official mark scheme VIDEO ▶ Starts at Q4 (1:44:00) Starts at Q4 (1:44:00) · by Sir Waleed Khanzada. Tap the picture to open it on YouTube.