Worked solution from the Cost and management accounting (AS Level) Theory (Paper 2) booklet, Part 2 of 2.
Contribution per unit = selling price − direct material − direct labour − variable overhead.
| Details | Ess $ | Tee $ | Ewe $ |
|---|---|---|---|
| Selling price | 30 | 43 | 69 |
| Direct material | 18 | 22 | 36 |
| Direct labour | 4 | 6 | 14 |
| Variable overhead | 2 | 3 | 5 |
| Contribution per unit | 6 | 12 | 14 [3] |
Contribution = contribution per unit × maximum demand. Fixed overheads per month = $96 000 ÷ 12 = $8 000.
| Details | $ |
|---|---|
| Ess 300 × $6 | 1 800 |
| Tee 400 × $12 | 4 800 |
| Ewe 360 × $14 | 5 040 |
| Maximum contribution | 11 640 [1] |
| Fixed overheads ($96 000 ÷ 12) | (8 000) [1] |
| Maximum profit | 3 640 [1] |
Hours per unit = labour cost ÷ $8: Ess 0.5, Tee 0.75, Ewe 1.75.
Ess 300 × 0.5 = 150; Tee 400 × 0.75 = 300; Ewe 360 × 1.75 = 630.
Total = 1 080 hours [1]
Labour is the limiting factor (900 hours, not 1 080). Rank the products by contribution per direct labour hour.
| Details | Ess | Tee | Ewe |
|---|---|---|---|
| Contribution per unit | $6 | $12 | $14 |
| Direct labour hours per unit | 0.5 | 0.75 | 1.75 |
| Contribution per labour hour | $12 | $16 | $8 [3] |
| Ranking | 2 | 1 | 3 [1] |
Production plan: make Tee first, then Ess, then Ewe with the hours left. Hours left for Ewe = 900 − 300 − 150 = 450; 450 ÷ 1.75 = 257 units.
| Details | $ |
|---|---|
| Tee 400 × $12 | 4 800 [1] |
| Ess 300 × $6 | 1 800 [1] |
| Ewe 257 units × $14 | 3 598 [2] |
| Maximum contribution | 10 198 [1] |
| Fixed overheads | (8 000) [1] |
| Maximum profit | 2 198 [1] |
All 1 080 hours are now worked, so 180 hours (1 080 − 900) are overtime. Premium = 25% × $8 = $2 per hour × 180 hours = $360. The bonus adds $200 to fixed overheads.
| Details | $ |
|---|---|
| Original maximum contribution | 11 640 |
| Less overtime premium | (360) [1] |
| Total contribution | 11 280 [1] |
| Fixed overheads $8 000 + bonus $200 | (8 200) [1] |
| Total profit | 3 080 [1] |
Write two disadvantages, each with its development (accept other valid responses):
A bonus may cause workers to rush [1]
which may affect the quality of the product. [1]
It will incur additional expenses [1]
which may not be passed on to the customer and so may reduce profit. [1]
Write two disadvantages, each with its development (accept other valid responses):
Budgets are based on estimates which may be inaccurate [1]
leading to bad decision-making. [1]
Budgets may be set too high [1]
which may demotivate employees. [1]