Cambridge AS Level Mathematics 9709 · 14.1 Representing data in diagrams

Q25 · 9709/53/M/J/25 Q4

Worked solution from the Representation of data Paper 5 Probability & Statistics 1 booklet, Part 1 of 2.

Q259709/53/M/J/25original Q4Structured · 5 marks
Question 4 from 9709/53/M/J/25

Worked solution

(a)

Read the graph at 7.5 minutes (about 70) and at 4 minutes (about 26). Subtract.

70 − 26 = 44 (43 or 44 is accepted) [1]

(b)

There are 84 values. Read the graph at 42 (median), 21 (lower quartile) and 63 (upper quartile).

Median ≈ 4.8 minutes. Draw the box with a line at 4.8. [1]

Lower quartile ≈ 3.7 or 3.8 and upper quartile ≈ 6.5 or 6.6. Draw the box ends there. [1]

The smallest time is 2 and the largest is 12. Draw whiskers from the box to 2 and to 12, not through the box. [1]

Draw it above a linear time scale running from 2 to 12, using at least half the grid, with at least 3 equally spaced values marked and labelled Time in minutes. [1]

KEY IDEAOn a cumulative frequency graph, read quartiles at 1/4, 1/2 and 3/4 of the total frequency. A box plot needs the minimum, LQ, median, UQ and maximum on a scale.
TOTAL 5 marks

Official mark scheme

Mark scheme for 9709/53/M/J/25 question 4
VIDEO
▶ Starts at Q4 (20:58)

Starts at Q4 (20:58) · by Ci Xiang Ng. Tap the picture to open it on YouTube.

Solutions follow the official Cambridge mark schemes; marks are shown in grey. Videos are from other YouTube channels. Paper codes read component / series / year: M/J = May/June, O/N = October/November. Past-paper questions © UCLES, reproduced for classroom practice.